Global Aquaculture Procurement Planning

Aquaculture Project Budget & Cost Planner

Estimate the full investment for your shrimp farm, fish farm, RAS or hatchery — equipment, logistics, engineering, contingency and financing. Auto-saved, exportable, multilingual, free.

Aquaculture Cost CalculatorShrimp Farm Cost CalculatorFish Farm Budget PlannerAquaculture Investment CalculatorRAS Cost CalculatorHatchery Cost EstimatorAquaculture Project Budget Planner

Español: estimador de presupuesto de estanque

Pond budget estimator

One pond · initial investment plus one production cycle. Enter measured dimensions, species-specific assumptions and dated quotes. No built-in market prices.

Submit a full pond budget

Species identifies your scenario; it does not insert survival, density or FCR recommendations. All amounts must use the selected currency; changing currency does not convert values.

Pond & production assumptions
Additional quoted costs

Other operating costs: juveniles, energy, water, labour, health/biosecurity, maintenance and any other cycle costs. Do not include feed or investment again.

Your cost scenario

Choose a species and complete the eight pond, production and feed inputs to calculate. Additional costs are excluded until entered.

Planning only, not a supplier quote or safe stocking approval. Water volume assumes a vertical-sided rectangle and mean working depth; sloped or irregular ponds need surveyed volume. Land, permits, taxes, financing and contingency are excluded unless explicitly included in your entered amounts.

No login required. Inputs stay on this page; nothing is sent to the CRM.

Formulas & assumptions

Area = length × width. Volume = area × mean depth. Stocked animals = area × animals/m². Harvest kg = stocked animals × survival/100 × harvest weight/1,000.

Economic feed requirement = harvested kg × entered economic FCR. This uses feed per harvested kg, not closed-cohort biomass-gain FCR; reconcile initial biomass, mortalities and transfers in your own records.

Construction = area × quoted cost/m². Total = construction + equipment/installation + feed kg × feed price + other cycle costs. National FAO production in the case studies is not a price, survival or farm-design input.

Detailed project budget

FishMatch Group · Aquaculture Project Budget Planner
New draft

How the planner works

  1. Step 1
    Define your project
    Company, country, project type, capacity, tanks and water source.
  2. Step 2
    Add equipment items
    Add unlimited equipment items across 17 aquaculture categories.
  3. Step 3
    Set logistics & project costs
    Model shipping, customs, engineering, civil works and contingency.
  4. Step 4
    Compare scenarios
    Adjust contingency, freight, FX and financing to stress-test the investment.
  5. Step 5
    Export & procure
    Download reports and continue to RFQ, tender or financing.

Specialised calculators

Frequently asked questions

The planner produces a directional CAPEX estimate based on your inputs and standard benchmarks for shrimp, fish, RAS and hatchery projects. Final pricing is confirmed after suppliers respond to your RFQ.

Shrimp farms, fish farms (pond and cage), RAS facilities and hatcheries. Each type uses tailored equipment categories and contingency benchmarks.

Yes. The scenario planner lets you set a financing rate, tenor and contingency. It computes an estimated annual debt service and USD-equivalent total investment.

Yes. You can export the full Project Budget Report, Investment Summary, Executive Summary and Cost Breakdown as PDF, DOCX or XLSX in one click.

Yes — the planner is 100% free for buyers. FishMatch Group is an independent procurement platform; suppliers pay a success-based fee only when they win.

Continue with FishMatch Group

Short answer

What is the fastest way to get quotes for Budget Planner?

Submit one structured request for Budget Planner. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.