How this estimate is calculated
Shrimp Farm Upgrade Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Tests whether intensifying an existing shrimp farm pays. Enter current pond area, yield and cycles, then the intensification target and the upgrade budget; the tool returns added production, extra operating cost, incremental margin, payback and cost per additional kg.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- Pond area to upgrade
- Buyer input
- Current yield per cycle
- Buyer input
- Target yield per cycle
- Buyer input
- Cycles per year
- Buyer input
- Current survival
- Buyer input
- Target survival after upgrade
- Buyer input
- Farmgate shrimp price
- Buyer input
- Current operating cost
- Buyer input
- Operating cost after upgrade
- Buyer input
- Upgrade cost
- Buyer input
- Added installed power
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- Indicative planning figures only — not a quotation, engineering design or investment advice.
- Intensification fails on power and water quality far more often than on aeration hardware; confirm grid capacity, backup and discharge before committing.
- Survival is the most sensitive input in the model. Test the pessimistic scenario before approving the budget.
- FishMatch Group is an independent aquaculture project sourcing and RFQ platform — not a farm, manufacturer, EPC contractor or lender.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.