Free tools · Việt Nam

9 Máy Tính Miễn Phí cho Người Nuôi Cá và Tôm

Trước khi trao đổi với nhà cung cấp, hãy tính. Công cụ miễn phí của FishMatch Group biến ý tưởng trang trại thành thông số kỹ thuật trong vài phút.

Pond volume
Pond Volume Calculator
Biomass
Biomass Calculator
Stocking density
Stocking Density Calculator
Oxygen demand
Oxygen Requirement Calculator
Fish & shrimp FCR
Fish & Shrimp FCR Calculator
Growth days
Fish Growth Calculator
Water exchange
Water Exchange Calculator
Harvest profit
Harvest Profit Calculator
Project economics
Aquaculture Project Economics & ROI Calculator
Pump sizing
Pump Sizing Calculator
Biofilter sizing
Biofilter Sizing Calculator
Shrimp farm
Shrimp Farm Calculator
Size a RAS loop: system volume, make-up water, biofilter and oxygen from target biomass.
RAS Sizing Calculator
Estimate annual feed tonnage and cost from production, FCR and feed price.
Feed Budget Calculator
Round tank volume
Round Tank Volume Calculator
Solar payback
Solar Aquaculture ROI Calculator
Solar payback (full)
Solar ROI & Payback (Load + Diesel + Tariff)
Solar pump PV
Solar Pump Sizing Calculator
Battery kWh
Battery Storage Sizing Calculator
Monthly OPEX
Operating Cost (OPEX) Calculator
Total kW load
Aquaculture Power Requirement Calculator
Genset kVA
Aquaculture Generator Sizing Calculator
Commercial CAPEX
Commercial Aquaculture CAPEX Estimator
Commercial ROI/IRR
Commercial Aquaculture ROI & IRR Calculator
Annual energy $
Aquaculture Energy Cost Calculator
Water use
Aquaculture Water Consumption Calculator
O₂ demand + LOX $
Commercial Oxygen Demand & LOX Cost Calculator
Annual feed $
Commercial Feed Consumption & Budget Calculator
Processing plant
Aquaculture Processing Plant Capacity Calculator
Seafood cold storage kW
Fish & Shrimp Harvest Cold Storage Calculator
Loan / DSCR
Aquaculture Financing & Loan Amortization Calculator
Aeration sizing
Aquaculture Aeration Calculator
Aerator payback
Aerator Energy Payback Calculator
Expansion planner
Aquaculture Farm Expansion Planner
Vacuum sizing
Shrimp Harvest Vacuum & Pump Sizing
Hatchery capacity
Hatchery Capacity Calculator
Water treatment
Aquaculture Water Treatment Calculator
Equipment cost
Fish & Shrimp Farm Equipment Cost Calculator
See how survival rate moves shrimp farm revenue and profit per cycle.
Shrimp Survival Rate Profit Calculator
Flow rate, turnover time and make-up water for a recirculating system.
RAS Water Turnover Calculator
Compare two project options on 5-year total cost of ownership and cost per kg.
Aquaculture TCO Comparison Calculator
Compare a RAS and a pond scenario on output, feed, oxygen, water, CAPEX/OPEX and cost per kg — all from your own inputs.
RAS vs Pond Scenario Comparison Calculator
Break down what a kilo of farmed shrimp actually costs to produce.
Shrimp Production Cost per Kg Calculator
Daily feed, cycle feed volume and feed cost for a shrimp cycle.
Shrimp Feed Requirement Calculator
Preliminary aeration horsepower, unit count and energy cost for a shrimp pond.
Shrimp Pond Aeration Calculator
Operational oxygen risk screen for a shrimp pond or tank.
Shrimp Dissolved Oxygen Risk Planner
Total farm electricity: aeration, pumping, oxygen, feeding, treatment and cost per kg.
Shrimp Farm Energy Calculator
Normalise a RAS or aquaculture quotation into CAPEX per tonne, CAPEX per standing biomass, energy per kg and scope-gap flags.
RAS Bid Normalizer
FCR cost impact
Cost of Poor FCR Calculator
Expansion readiness
Expansion Readiness Assessment
Cost pressure
Aquaculture Cost Pressure Calculator
CAPEX estimator
Aquaculture CAPEX Estimator
OPEX estimator
Aquaculture OPEX Estimator
RAS feasibility
RAS Feasibility Calculator
Shrimp upgrade
Shrimp Farm Upgrade Calculator
Cage capacity
Cage Farming Capacity Calculator
Hatchery planning
Hatchery Planning Calculator
Feed mill capacity
Feed Mill Capacity Calculator
Compare your current feed with a better feed or feeding system: yearly saving, extra margin and payback.
Feed Return Calculator
Check DO saturation, safety margin, time to critical oxygen if aeration fails, and the aerator power you need.
Dissolved Oxygen Calculator
RAS biofilter media area and volume from daily feed rate and TAN load
Biofilter Sizing Calculator
Farm-gate price you need to cover full production cost
Break-Even Price Calculator
Site area needed for a target production by farming system
Land Requirement Calculator

Vì sao dùng

Nhà cung cấp báo giá theo yêu cầu của bạn. Tính sai hôm nay = 15 năm trả giá.

Kích thước ao

Thể tích m³/L và mật độ thả theo loài: rô phi, tôm thẻ, cá tra, cá basa, cá chép.

Chất lượng nước

Nhu cầu oxy theo sinh khối và lưu lượng bơm cho thay nước hàng ngày.

Sinh học

Sinh khối, FCR và ngày tới thu hoạch với SGR.

Tài chính

CAPEX/OPEX/hoàn vốn cho RAS, ao, lồng, biofloc.

Từ máy tính đến RFQ

Yêu cầu nhà cung cấp đã xác minh hoặc tài trợ chỉ một cú nhấp.

Global coverage

Countries covered by the calculator guides

IndiaVietnamIndonesiaThailandPhilippinesMalaysiaChinaJapanSouth KoreaBangladeshSri LankaEcuadorPeruMexicoBrazilChileColombiaHondurasEgyptSaudi ArabiaUAETurkeyMoroccoTunisiaOmanKuwaitNorwayIcelandSpainGreecePortugalItalyGermanyFranceNigeriaGhanaKenyaUgandaSouth AfricaSenegalUSACanadaAustraliaNew Zealand

FAQ

Có. Nhà cung cấp trả phí khi chốt đơn.

Rô phi, cá hồi, cá tra, cá chép, tôm thẻ, cá vược, cá trê.

Có — ROI & RAS khớp mẫu DFI và cho thuê.

Toàn cầu — trọng tâm Việt Nam, Thái Lan, Indonesia.
Open all calculators Build my RFQ

Read in another language