Free tools · الشرق الأوسط وشمال أفريقيا

9 حاسبات مجانية لمربي الأسماك والروبيان

قبل التحدث إلى المورد، احسب. أدوات FishMatch Group المجانية تحول فكرة المزرعة إلى مواصفات هندسية في دقائق.

Pond volume
Pond Volume Calculator
Biomass
Biomass Calculator
Stocking density
Stocking Density Calculator
Oxygen demand
Oxygen Requirement Calculator
Fish & shrimp FCR
Fish & Shrimp FCR Calculator
Growth days
Fish Growth Calculator
Water exchange
Water Exchange Calculator
Harvest profit
Harvest Profit Calculator
Project economics
Aquaculture Project Economics & ROI Calculator
Pump sizing
Pump Sizing Calculator
Biofilter sizing
Biofilter Sizing Calculator
Shrimp farm
Shrimp Farm Calculator
Size a RAS loop: system volume, make-up water, biofilter and oxygen from target biomass.
RAS Sizing Calculator
Estimate annual feed tonnage and cost from production, FCR and feed price.
Feed Budget Calculator
Round tank volume
Round Tank Volume Calculator
Solar payback
Solar Aquaculture ROI Calculator
Solar payback (full)
Solar ROI & Payback (Load + Diesel + Tariff)
Solar pump PV
Solar Pump Sizing Calculator
Battery kWh
Battery Storage Sizing Calculator
Monthly OPEX
Operating Cost (OPEX) Calculator
Total kW load
Aquaculture Power Requirement Calculator
Genset kVA
Aquaculture Generator Sizing Calculator
Commercial CAPEX
Commercial Aquaculture CAPEX Estimator
Commercial ROI/IRR
Commercial Aquaculture ROI & IRR Calculator
Annual energy $
Aquaculture Energy Cost Calculator
Water use
Aquaculture Water Consumption Calculator
O₂ demand + LOX $
Commercial Oxygen Demand & LOX Cost Calculator
Annual feed $
Commercial Feed Consumption & Budget Calculator
Processing plant
Aquaculture Processing Plant Capacity Calculator
Seafood cold storage kW
Fish & Shrimp Harvest Cold Storage Calculator
Loan / DSCR
Aquaculture Financing & Loan Amortization Calculator
Aeration sizing
Aquaculture Aeration Calculator
Aerator payback
Aerator Energy Payback Calculator
Expansion planner
Aquaculture Farm Expansion Planner
Vacuum sizing
Shrimp Harvest Vacuum & Pump Sizing
Hatchery capacity
Hatchery Capacity Calculator
Water treatment
Aquaculture Water Treatment Calculator
Equipment cost
Fish & Shrimp Farm Equipment Cost Calculator
See how survival rate moves shrimp farm revenue and profit per cycle.
Shrimp Survival Rate Profit Calculator
Flow rate, turnover time and make-up water for a recirculating system.
RAS Water Turnover Calculator
Compare two project options on 5-year total cost of ownership and cost per kg.
Aquaculture TCO Comparison Calculator
Compare a RAS and a pond scenario on output, feed, oxygen, water, CAPEX/OPEX and cost per kg — all from your own inputs.
RAS vs Pond Scenario Comparison Calculator
Break down what a kilo of farmed shrimp actually costs to produce.
Shrimp Production Cost per Kg Calculator
Daily feed, cycle feed volume and feed cost for a shrimp cycle.
Shrimp Feed Requirement Calculator
Preliminary aeration horsepower, unit count and energy cost for a shrimp pond.
Shrimp Pond Aeration Calculator
Operational oxygen risk screen for a shrimp pond or tank.
Shrimp Dissolved Oxygen Risk Planner
Total farm electricity: aeration, pumping, oxygen, feeding, treatment and cost per kg.
Shrimp Farm Energy Calculator
Normalise a RAS or aquaculture quotation into CAPEX per tonne, CAPEX per standing biomass, energy per kg and scope-gap flags.
RAS Bid Normalizer
FCR cost impact
Cost of Poor FCR Calculator
Expansion readiness
Expansion Readiness Assessment
Cost pressure
Aquaculture Cost Pressure Calculator
CAPEX estimator
Aquaculture CAPEX Estimator
OPEX estimator
Aquaculture OPEX Estimator
RAS feasibility
RAS Feasibility Calculator
Shrimp upgrade
Shrimp Farm Upgrade Calculator
Cage capacity
Cage Farming Capacity Calculator
Hatchery planning
Hatchery Planning Calculator
Feed mill capacity
Feed Mill Capacity Calculator
Compare your current feed with a better feed or feeding system: yearly saving, extra margin and payback.
Feed Return Calculator
Check DO saturation, safety margin, time to critical oxygen if aeration fails, and the aerator power you need.
Dissolved Oxygen Calculator
RAS biofilter media area and volume from daily feed rate and TAN load
Biofilter Sizing Calculator
Farm-gate price you need to cover full production cost
Break-Even Price Calculator
Site area needed for a target production by farming system
Land Requirement Calculator

لماذا نستخدم الحاسبات

الموردون يسعّرون ما تطلبه. حساب خاطئ اليوم يعني 15 عاماً من الدفع الزائد.

قياس الأحواض والخزانات

الحجم بالمتر المكعب واللتر وكثافة التخزين لكل نوع: البلطي، السلمون، الروبيان، القاروص، السلمون المرقط، السلور.

جودة المياه: الأكسجين والتبادل

الطلب على الأكسجين حسب الكتلة الحيوية ومعدلات تنفس الأنواع، وتدفق المضخات.

البيولوجيا والأداء

الكتلة الحيوية، FCR والزمن حتى الحصاد باستخدام SGR.

المال: العائد وتكلفة RAS

CAPEX وOPEX وفترة الاسترداد لأنظمة RAS، البرك، الأقفاص والبيوفلوك.

من الحاسبة إلى RFQ

اطلب عروض موردين مناسبين أو تمويلاً بضغطة واحدة. مجاني للمشترين.

Global coverage

Countries covered by the calculator guides

IndiaVietnamIndonesiaThailandPhilippinesMalaysiaChinaJapanSouth KoreaBangladeshSri LankaEcuadorPeruMexicoBrazilChileColombiaHondurasEgyptSaudi ArabiaUAETurkeyMoroccoTunisiaOmanKuwaitNorwayIcelandSpainGreecePortugalItalyGermanyFranceNigeriaGhanaKenyaUgandaSouth AfricaSenegalUSACanadaAustraliaNew Zealand

FAQ

نعم. الموردون يدفعون عند الإتمام.

البلطي، السلمون، القاروص، الروبيان، السلور، الكارب.

نعم — ROI وRAS يطابقان قوالب DFI والتأجير.

عالمياً — مصر، السعودية، الإمارات، المغرب، تونس، الجزائر، عُمان، الكويت.
Open all calculators Build my RFQ

Read in another language

FishMatch Group email updates

Get the buyer intelligence briefing

Practical aquaculture intelligence for sourcing and project decisions: new buyer guides, dated official-source updates and free tools, for the topics you choose.

What you will receive

  • A short digest of newly published FishMatch Group articles and center updates for your topics
  • A summary, publication date and link to the full article for every item
  • No advertising, supplier promotions or sales calls; subscribing never creates a sourcing request

We first email you a confirmation link. Your subscription starts only after you confirm.

Digest sending is still being set up. Confirmed subscribers receive the first digest when it starts; nothing else is sent.

Topics
How often

Read our Privacy Policy. Subscribing is separate from any procurement request.