Aquaculture Feed ROI Calculator

Flexes the improved FCR, improved feed price and investment — the numbers suppliers promise and buyers should stress-test.
Calculator inputs
Enter 0 if you only switch feed
Results
Yearly feed saving
Improved option costs less per year
Feed cost per kg produced
$1.76 → $1.62
Yearly feed bill
$880,000 → $810,000
Feed as share of revenue
50.3% → 46.3%
Payback on extra investment
20.6 months
Results at a glance
| Output | Pessimistic | Base case | Optimistic |
|---|---|---|---|
| Yearly feed saving | $-38,540 | $70,000 | $133,585 |
| Feed cost per kg produced | $1.76 → $1.84 | $1.76 → $1.62 | $1.76 → $1.49 |
| Yearly feed bill | $880,000 → $918,540 | $880,000 → $810,000 | $880,000 → $746,415 |
| Feed as share of revenue | 50.3% → 52.5% | 50.3% → 46.3% | 50.3% → 42.7% |
| Payback on extra investment | Does not pay back | 20.6 months | 9.7 months |
| 5-year net return | $-330,700 | $230,000 | $559,925 |
Scenario range
Yearly feed saving
Result summary with the inputs used
Inputs used
- Annual production
- 500 t/year
- Selling price
- 3.5 $/kg
- Current FCR
- 1.6 kg feed / kg
- Current feed price
- 1.1 $/kg
- Improved FCR
- 1.35 kg feed / kg
- Improved feed price
- 1.2 $/kg
- Extra investment (feeders, barge, sensors)
- 120,000 $
Results · Base case scenario
- Yearly feed saving
- $70,000
- Improved option costs less per year
- Feed cost per kg produced
- $1.76 → $1.62
- Current → improved
- Yearly feed bill
- $880,000 → $810,000
- 125 t less feed per year
- Feed as share of revenue
- 50.3% → 46.3%
- Revenue $1,750,000/year
- Payback on extra investment
- 20.6 months
- 5-year net return
- $230,000
- 192% on $120,000 invested
Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.
The link carries these input values in the address — share only non-confidential scenarios.
Turn your assumptions into a reviewed project brief
For commercial projects of USD 250,000 or more, FishMatch reviews your RFQ before managed supplier contact. Supplier-neutral sourcing; buyer tools are free with no purchase obligation. Opening a draft does not submit it. Buyer and supplier identities remain private; accepting a proposal does not automatically reveal them.
How supplier matching works
- 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
- 2. Confidential outreach. The team reviews the private brief before supplier outreach. Buyer and supplier identities and direct contacts remain private; accepting a proposal does not automatically reveal them.
- 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
- 4. Financing intro (optional). Possible introductions to independent providers require separate recipient-specific recorded consent, provider confirmation and local legal review. FishMatch is not a lender; availability, approval and terms are not guaranteed.
How do you calculate feed ROI in aquaculture?
Feed ROI = yearly feed saving ÷ investment. Yearly feed saving = production (kg) × (current FCR × current price − improved FCR × improved price). Payback months = investment ÷ (yearly feed saving ÷ 12). Whether it pays back depends on your own FCR, feed prices and production, not on a typical figure.
Get feed and feeding-system quotes — comparable quotes from screened manufacturers; timing depends on scope and supplier response.
In short
Feed Return Calculator turns annual production, selling price, current fcr, current feed price, improved fcr, improved feed price and extra investment (feeders, barge, sensors) into yearly feed saving, feed cost per kg produced, yearly feed bill, feed as share of revenue, payback on extra investment and 5-year net return. Feed is often the largest cost of growing fish or shrimp. This tool compares your current feed and FCR with an improved feed or automatic feeding system and shows the yearly feed saving, feed cost per kg produced, the change in margin and how fast any extra investment pays back. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.
- Annual production (t/year)
- Selling price ($/kg)
- Current FCR (kg feed / kg)
- Current feed price ($/kg)
- Improved FCR (kg feed / kg)
- Improved feed price ($/kg)
- Extra investment (feeders, barge, sensors) ($) — Enter 0 if you only switch feed
- Yearly feed saving
- Feed cost per kg produced
- Yearly feed bill
- Feed as share of revenue
- Payback on extra investment
- 5-year net return
- Enter annual production, selling price, current fcr, current feed price, improved fcr, improved feed price and extra investment (feeders, barge, sensors).
- Read the highlighted result and the supporting figures below it.
- Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
- Send the spec to suppliers as a pre-filled RFQ draft.
What does the Feed Return Calculator estimate?
The Feed Return Calculator estimates yearly feed saving, feed cost per kg produced, yearly feed bill from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.
Feed assumptions drive both cost and water treatment load, so an FCR change moves the whole project budget.
AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.
What can change the result of the Feed Return Calculator?
These factors move the result more than equipment size does:
- Species and strain
- System type (RAS, pond, cage, tank)
- Water quality limits (TAN, CO₂, solids)
- Operating strategy and staffing
Based on: annual production, selling price, current fcr, current feed price.
This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: species and strain, system type (ras, pond, cage, tank), water quality limits (tan, co₂, solids), operating strategy and staffing. Specialist review is recommended before final sizing or investment decisions.
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
How this estimate is calculated
Feed Return Calculator · calculation version 1.0.0 · reviewed 2026-11-19 by implementation review; independent validation not included · confidence: planning estimate
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Compare feed conversions and feed prices at unchanged annual production.
How it was calculated
- annual kg = annual t × 1,000; each feed cost = annual kg × FCR × its feed USD/kg; cost/kg harvested = FCR × feed USD/kg
- annual saving = current feed cost − scenario feed cost; feed t saved = annual kg × (current FCR − scenario FCR) ÷ 1,000
- payback months = investment ÷ saving × 12 if both are positive; five-year net saving = 5 × annual saving − investment
Where each value comes from
- Annual production (t/year)
- Buyer input
- Selling price ($/kg)
- Buyer input
- Current FCR (kg feed / kg)
- Buyer input
- Current feed price ($/kg)
- Buyer input
- Improved FCR (kg feed / kg)
- Buyer input
- Improved feed price ($/kg)
- Buyer input
- Extra investment (feeders, barge, sensors) ($)
- Buyer input
Model assumptions
- Sale price and output are unchanged; revenue is annual kg × sale USD/kg. Feed-only margin differences equal feed savings.
Worked example (hypothetical)
At 100 t/year, FCR 1.6 with feed at USD 1/kg costs USD 160,000. FCR 1.4 at USD 1.20/kg costs USD 168,000, despite using less feed.
Limitations
- No validated FCR change, maintenance, tax, financing or other operating effects are modeled.
What must be confirmed before you build
- Use matched cohort feed and biomass records, current delivered quotes and the actual full added cost.
Method and reference sources
- FishMatch Group — Implemented model — not independent evidence for default inputsprimary
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.
Worked example
An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.
| Annual production | 500 t/year |
|---|---|
| Selling price | 3.5 $/kg |
| Current FCR | 1.6 kg feed / kg |
| Current feed price | 1.1 $/kg |
| Improved FCR | 1.35 kg feed / kg |
| Improved feed price | 1.2 $/kg |
| Extra investment (feeders, barge, sensors) | 120000 $ |
| Yearly feed saving | $70,000 |
|---|---|
| Feed cost per kg produced | $1.76 → $1.62 |
| Yearly feed bill | $880,000 → $810,000 |
| Feed as share of revenue | 50.3% → 46.3% |
| Payback on extra investment | 20.6 months |
| 5-year net return | $230,000 |
Who should use the feed return calculator?
Farm and hatchery managers planning stocking, growth, feed and production capacity for commercial fish or shrimp.
What decision does it support?
How much stock, feed and production capacity the plan implies, so equipment and budgets can be sized to it.
What inputs do you need?
- Annual production (t/year)
- Selling price ($/kg)
- Current FCR (kg feed / kg)
- Current feed price ($/kg)
- Improved FCR (kg feed / kg)
- Improved feed price ($/kg)
- Extra investment (feeders, barge, sensors) ($)
Is it for commercial farms or aquariums?
Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.
Get feed and feeding-system quotes
Your production, current FCR and target FCR go to our sourcing desk, already filled in. We compare feed and feeder offers for you.
For a comparable quote, share the inputs you entered above, the result shown and how many units or sites you need. Suppliers size equipment and scope from these figures; the result is a free planning estimate, not a supplier quote.
Selling or sourcing harvested seafood rather than farm equipment? Commodity seafood trade is handled by Global B2B Group.
Technical checklist
Short answer: Compare your current feed with a better feed or feeding system: yearly saving, extra margin and payback. The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.
Before you use the result
- Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
- Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
- Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
- Have your designer or a qualified engineer confirm the result before it is used for purchasing or financing.
- Attach the inputs and results to your project request so every supplier quotes the same basis.
Sources
No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.
Stated assumptions (starting values)
These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.
- Annual production: starts at 500 t/year
- Selling price: starts at 3.5 $/kg
- Current FCR: starts at 1.6 kg feed / kg
- Current feed price: starts at 1.1 $/kg
- Improved FCR: starts at 1.35 kg feed / kg
- Improved feed price: starts at 1.2 $/kg
- Extra investment (feeders, barge, sensors): starts at 120000 $
Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.
Notes
- Assumes the same production volume and selling price in both cases; a better FCR often also improves growth and water quality, which is not counted here.
- Ask feed and feeding-system suppliers for FCR evidence from farms with similar species, water temperature and system type.
- Indicative planning figures only — not a guarantee of supplier performance.
Compare your current feed with a better feed or feeding system: yearly saving, extra margin and payback. FAQs
Available in other languages
Other aquaculture calculators
Turn this estimate into a reviewed RFQ
Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.
Request a quote