How this estimate is calculated
Water Exchange Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: high
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Convert an exchange target into daily water volume and flow requirement.
How it was calculated
- daily_exchange_m3 = system_volume_m3 × exchange_%_per_day ÷ 100
- continuous_flow_L_per_s = daily_exchange_m3 × 1000 ÷ 86,400
Where each value comes from
- System volume
- Buyer input
- Exchange rate
- System assumption
What the outputs mean
- Daily water requirement
- Equivalent continuous flow
Engineering assumptions
- Assumes continuous, evenly distributed exchange rather than batch exchange.
Limitations
- Does not verify that the site water source can sustain the requirement, nor that discharge is permitted.
What must be confirmed before you build
- Water-resource assessment and abstraction rights
- Discharge consent and effluent limits
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.