How this estimate is calculated
Aquaculture Water Consumption Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Water permits are the #1 approval risk for commercial aquaculture. This tool converts system volume, exchange rate and evaporation into daily/annual make-up water and per-kg-fish intensity — the number regulators, banks and ESG auditors actually ask for.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- System type
- Buyer input
- System water volume
- Buyer input
- Daily exchange rate
- Buyer input
- Evaporation
- Buyer input
- Water surface area
- Buyer input
- Annual production
- Buyer input
- Water tariff / pumping cost
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- Water abstraction permits often cap m³/day — check limits before finalising system design.
- RAS cuts water use 90–99% vs flow-through and is the only route in water-stressed regions.
- Reject water requires effluent treatment — see the Wastewater / Effluent center.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.