How this estimate is calculated
Stocking Density Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Express biomass per unit water volume and compare it against a system-specific planning band.
How it was calculated
- density_kg_per_m3 = standing_biomass_kg ÷ water_volume_m3
- Status is a comparison against the selected system band: RAS 60–120, flow-through 25–60, cage 15–40, pond 2–10 kg/m³.
Where each value comes from
- Total biomass
- Buyer input
- Water volume
- Buyer input
- Production system
- System assumption
What the outputs mean
- Density in kg/m³
- Position relative to the planning band for the selected system
Biological assumptions
- Bands are generic system ranges, not species-specific limits. Species-specific ranges are held in the species assumption library.
Limitations
- No density shown here is universally safe. The achievable density depends on oxygenation, water quality, health status, husbandry and — in several jurisdictions — the legal licence limit.
- The band is not adjusted for temperature, species sensitivity or life stage.
What must be confirmed before you build
- Legal or licensed maximum density at the site
- Oxygen and biofiltration capacity at peak biomass
- Veterinary and welfare review
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.