How this estimate is calculated
Pump Sizing Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: medium
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Derive required flow, indicative hydraulic and shaft power, and an indicative pipe diameter for pre-quotation discussion.
How it was calculated
- flow_m3_per_h = system_volume_m3 × turnovers_per_hour
- hydraulic_kW = ρ × g × Q × H ÷ 1000, with ρ = 1000 kg/m³, g = 9.81 m/s², Q in m³/s, H = total dynamic head in m
- shaft_kW = hydraulic_kW ÷ (pump_efficiency_% ÷ 100)
- pipe_diameter_mm = √(4Q ÷ (π × 1.5 m/s)) × 1000
Where each value comes from
- System volume
- Buyer input
- Turnover rate
- System assumption
- Total dynamic head
- Requires professional review
- Pump efficiency
- Requires supplier confirmation
What the outputs mean
- Required flow
- Indicative hydraulic and shaft power
- Indicative pipe diameter at 1.5 m/s design velocity
Engineering assumptions
- Total dynamic head is a user input, not a computed value — it must come from a hydraulic calculation of static lift, pipe friction, fittings and treatment pressure loss.
- Pipe diameter is sized at a 1.5 m/s design velocity, a common planning convention rather than an optimised result.
Limitations
- This is not pump selection. It does not produce a duty point, NPSH check, motor rating, duty/standby arrangement or a pump model.
- Add 15–25% design margin for filter fouling and future capacity before quoting.
What must be confirmed before you build
- Full hydraulic calculation and system curve
- NPSH available at the pump
- Duty/standby and redundancy strategy
- Final pump and pipe selection by the integrator
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.