How this estimate is calculated
Oxygen Requirement Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Estimate a planning range for dissolved-oxygen consumption by the standing stock.
How it was calculated
- hourly_O2_kg = biomass_kg × species_rate_mg_per_kg_per_h × temperature_factor ÷ 1,000,000
- daily_O2_kg = hourly_O2_kg × 24
- design_value_kg_per_h = hourly_O2_kg × 1.5 (50% planning margin)
Where each value comes from
- Species
- Reference assumption
- Standing biomass
- Buyer input
- Temperature factor
- System assumption
What the outputs mean
- Indicative hourly oxygen consumption
- Daily consumption
- Design value including planning margin
Biological assumptions
- Consumption rates are species-level planning averages for grow-out, not measured site data.
- Peak demand occurs 2–4 hours after feeding; the 1.5× margin is a planning allowance for that peak, not a measured peak.
Engineering assumptions
- This is oxygen CONSUMED by the stock. It is not an equipment rating: transfer efficiency, background oxygen and altitude/salinity saturation must be applied before sizing any device.
Limitations
- Does not model biofilter, sediment or bacterial oxygen demand, which can be a large share of total system demand in RAS and biofloc.
- Emergency oxygen (power failure) is a separate calculation and is not covered here.
What must be confirmed before you build
- Transfer efficiency of the proposed oxygenation equipment
- Emergency oxygen duration and backup design
- Engineering review of total system oxygen demand
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.