How this estimate is calculated
Aquaculture Farm Expansion Planner · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Existing producers rarely expand by adding ponds alone — capacity is usually limited by water, oxygen, pumping or power long before it is limited by area. This planner converts your current and target annual production into the incremental infrastructure the extra tonnage implies: additional standing biomass, water volume, aeration power, pump flow, connected load and an indicative CAPEX band. Use it to structure a system-by-system review before requesting equipment quotes.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- Species
- Buyer input
- Current production
- Buyer input
- Target production
- Buyer input
- Production cycles per year
- Buyer input
- Production system
- Buyer input
- Working density
- Buyer input
- Daily water exchange
- Buyer input
- Aeration efficiency
- Buyer input
- Indicative CAPEX intensity
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- Density, exchange rate and CAPEX intensity vary widely by species, climate, water source and farm design — override the defaults with your own operating data.
- Check power availability and backup capacity before ordering equipment: expansion usually raises connected load faster than area.
- Filtration, water treatment, monitoring and biosecurity scale with the added biomass, not with the added area.
- Outputs are planning-level estimates, not an engineering design or a guarantee of biological performance.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.