How this estimate is calculated
Aquaculture Cold Storage & Refrigeration Calculator · calculation version 0.9.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate · methodology review pending
Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Purpose
Every commercial aquaculture project needs a chilled buffer (0–4 °C) plus a frozen store (–20 to –25 °C). This tool sizes room volume, pallet capacity, refrigeration load (kW), annual energy cost and indicative CAPEX so you can spec the cold-chain package before contacting suppliers.
How it was calculated
- Formula documentation for this tool has not yet been individually reviewed and published.
Where each value comes from
- Chilled buffer capacity
- Buyer input
- Frozen store capacity
- Buyer input
- IQF freezer throughput
- Buyer input
- Ambient temperature
- Buyer input
- Panel insulation
- Buyer input
- IQF operating hours
- Buyer input
- Electricity tariff
- Buyer input
Limitations
- This tool has not yet passed the documented-methodology review. Treat every output as an unverified planning estimate.
- IQF product must reach -18 °C core within 90 min — spec plate/blast freezer accordingly.
- Ammonia (NH₃) systems win on TCO above ~150 kW; smaller plants use CO₂ or HFC.
- Backup power for cold storage is mandatory — pair with the generator sizing calculator.
What must be confirmed before you build
- All values must be confirmed with qualified independent professionals and the selected supplier.
Sources for default assumptions
Next step
Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.