Aquaculture market guide
Aquaculture in United Arab Emirates: suppliers, costs and project planning
FishMatch Group helps commercial buyers in United Arab Emirates source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are salmon, shrimp, seabream, barramundi; typical water temperatures are 20–34 °C and industrial electricity costs about USD 0.11 per kWh.
The UAE backs food security with indoor RAS for salmon, shrimp and seabream; high air temperatures make chilling and power design key.
Key planning facts
- Main species
- salmon, shrimp, seabream, barramundi
- Common systems
- RAS (recirculating)
- Water temperature
- 20–34 °C
- Industrial electricity
- USD 0.11 / kWh
- Water cost
- ≈ USD 2.00 / m³
- Compound feed
- ≈ AED 6 (≈ $2) / kg
- VAT / GST on equipment
- 5%
- Currency
- AED (≈ 3.67 / USD)
- Licensing authority
- Ministry of Climate Change and Environment (MOCCAE)
- Main import ports
- Jebel Ali, Khalifa and Khor Fakkan
What to check before requesting quotes in United Arab Emirates
- Confirm your water source and year-round temperature (20–34 °C) for salmon.
- Budget energy carefully: at about USD 0.11/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Ministry of Climate Change and Environment (MOCCAE).
- Plan equipment logistics and lead times through Jebel Ali, Khalifa and Khor Fakkan.
- Check water rights or tariffs: municipal water costs about USD 2.00 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 5% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in United Arab Emirates?
An indicative 250-tonne-per-year RAS in United Arab Emirates costs roughly AED 9.5M (≈ $2.6M) – AED 14.8M (≈ $4M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in United Arab Emirates?
Commercial projects in United Arab Emirates mainly focus on salmon, shrimp, seabream, barramundi.
Who licenses aquaculture in United Arab Emirates?
Licensing and environmental approval usually involve Ministry of Climate Change and Environment (MOCCAE). Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia