The UAE backs food security with indoor RAS for salmon, shrimp and seabream; high air temperatures make chilling and power design key. Below are answers to the questions buyers ask most when planning a commercial fish or shrimp project in United Arab Emirates. Prices are indicative 2026 planning figures, not quotes.
The main commercial species are salmon, shrimp, seabream, barramundi. Water temperatures typically range from 20 to 34 °C, which shapes which species and systems fit best.
The most common systems are RAS (recirculating). The right choice depends on species, site, water availability and budget.
Business electricity costs about AED 0 (≈ $0) per kWh (GlobalPetrolPrices-based 2026 planning figure). Energy matters most for RAS and aerated ponds.
Industrial or municipal water is estimated at about AED 7 (≈ $2) per m³. This is a planning estimate; confirm local tariffs and water rights for your site.
Compound feed is estimated at about AED 6 (≈ $2) per kg, depending on species, protein level and import costs.
The standard VAT/GST rate is 5%. Import duties and agricultural exemptions vary, so check with a local tax adviser before budgeting.
As a rough planning range, a 250 t/year RAS for salmon costs about AED 9.5M (≈ $2.6M) to AED 14.8M (≈ $4.0M) in equipment and installation, before land and buildings.
Aquaculture is overseen by Ministry of Climate Change and Environment (MOCCAE). Licences, environmental and water permits should be started early.
Main entry ports include Jebel Ali, Khalifa and Khor Fakkan. Prices can be quoted in AED (about 3.67 per USD).
No. Supplier details stay private at the quote stage. Our team shares comparable, anonymised offers and introduces you once you decide to move forward.
A specialist reviews it by hand, asks for any missing information and shortlists suitable suitable suppliers. Nothing is forwarded automatically.
Planning a project in United Arab Emirates?
Send one request. Our team reviews it by hand and prepares comparable quotes from suitable suppliers. Typical projects start from about USD 250,000.
Submit a private request for UAE with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.
How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation