Aquaculture market guide
Aquaculture in Türkiye: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Türkiye source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are seabass, seabream, trout; typical water temperatures are 8–26 °C and industrial electricity costs about USD 0.14 per kWh.
Türkiye is a top producer of seabass, seabream and Black Sea trout with strong local cage and feed manufacturing.
Key planning facts
- Main species
- seabass, seabream, trout
- Common systems
- Cages, Flow-through raceways, RAS (recirculating)
- Water temperature
- 8–26 °C
- Industrial electricity
- USD 0.14 / kWh
- Water cost
- ≈ USD 1.50 / m³
- Compound feed
- ≈ TRY 52 (≈ $1) / kg
- VAT / GST on equipment
- 20%
- Currency
- TRY (≈ 40 / USD)
- Licensing authority
- Ministry of Agriculture and Forestry (General Directorate of Fisheries and Aquaculture)
- Main import ports
- Izmir, Mersin and Istanbul
What to check before requesting quotes in Türkiye
- Confirm your water source and year-round temperature (8–26 °C) for seabass.
- Budget energy carefully: at about USD 0.14/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Ministry of Agriculture and Forestry (General Directorate of Fisheries and Aquaculture).
- Plan equipment logistics and lead times through Izmir, Mersin and Istanbul.
- Check water rights or tariffs: municipal water costs about USD 1.50 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 20% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Türkiye?
An indicative 250-tonne-per-year RAS in Türkiye costs roughly TRY 81M (≈ $2M) – TRY 126M (≈ $3.2M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Türkiye?
Commercial projects in Türkiye mainly focus on seabass, seabream, trout.
Who licenses aquaculture in Türkiye?
Licensing and environmental approval usually involve Ministry of Agriculture and Forestry (General Directorate of Fisheries and Aquaculture). Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia