Aquaculture market guide
Aquaculture in Norway: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Norway source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are salmon, trout; typical water temperatures are 4–14 °C and industrial electricity costs about USD 0.11 per kWh.
Norway sets the global benchmark for salmon farming. Post-smolt RAS, closed and semi-closed pens and offshore concepts dominate new investment.
Key planning facts
- Main species
- salmon, trout
- Common systems
- Cages, RAS (recirculating)
- Water temperature
- 4–14 °C
- Industrial electricity
- USD 0.11 / kWh
- Water cost
- ≈ USD 2.50 / m³
- Compound feed
- ≈ NOK 18 (≈ $2) / kg
- VAT / GST on equipment
- 25%
- Currency
- NOK (≈ 10.6 / USD)
- Licensing authority
- Directorate of Fisheries (Fiskeridirektoratet) and the Norwegian Food Safety Authority
- Main import ports
- Bergen, Ålesund and Trondheim
What to check before requesting quotes in Norway
- Confirm your water source and year-round temperature (4–14 °C) for salmon.
- Budget energy carefully: at about USD 0.11/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Directorate of Fisheries (Fiskeridirektoratet) and the Norwegian Food Safety Authority.
- Plan equipment logistics and lead times through Bergen, Ålesund and Trondheim.
- Check water rights or tariffs: municipal water costs about USD 2.50 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 25% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Norway?
An indicative 250-tonne-per-year RAS in Norway costs roughly NOK 31M (≈ $2.9M) – NOK 48.2M (≈ $4.6M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Norway?
Commercial projects in Norway mainly focus on salmon, trout.
Who licenses aquaculture in Norway?
Licensing and environmental approval usually involve Directorate of Fisheries (Fiskeridirektoratet) and the Norwegian Food Safety Authority. Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia