Aquaculture market guide
Aquaculture in Austria: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Austria source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are trout, carp, catfish; typical water temperatures are 6–18 °C and industrial electricity costs about USD 0.29 per kWh.
Austria imports most of its fish; trout flow-through farms and carp ponds are expanding with RAS to raise self-sufficiency.
Key planning facts
- Main species
- trout, carp, catfish
- Common systems
- Flow-through raceways, Ponds, RAS (recirculating)
- Water temperature
- 6–18 °C
- Industrial electricity
- USD 0.29 / kWh
- Water cost
- ≈ USD 2.50 / m³
- Compound feed
- ≈ €2 (≈ $2) / kg
- VAT / GST on equipment
- 20%
- Currency
- EUR (≈ 0.92 / USD)
- Licensing authority
- Federal Ministry of Agriculture and provincial fisheries authorities
- Main import ports
- Imports via Hamburg, Koper and Trieste
What to check before requesting quotes in Austria
- Confirm your water source and year-round temperature (6–18 °C) for trout.
- Budget energy carefully: at about USD 0.29/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Federal Ministry of Agriculture and provincial fisheries authorities.
- Plan equipment logistics and lead times through Imports via Hamburg, Koper and Trieste.
- Check water rights or tariffs: municipal water costs about USD 2.50 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 20% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Austria?
An indicative 250-tonne-per-year RAS in Austria costs roughly €2.6M (≈ $2.8M) – €4M (≈ $4.4M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Austria?
Commercial projects in Austria mainly focus on trout, carp, catfish.
Who licenses aquaculture in Austria?
Licensing and environmental approval usually involve Federal Ministry of Agriculture and provincial fisheries authorities. Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia