Aquaculture market guide
Aquaculture in Indonesia: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Indonesia source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are shrimp, tilapia, pangasius, barramundi; typical water temperatures are 26–32 °C and industrial electricity costs about USD 0.07 per kWh.
Indonesia is a top shrimp and tilapia producer; intensive lined shrimp ponds and cage tilapia on lakes attract most equipment spend.
Key planning facts
- Main species
- shrimp, tilapia, pangasius, barramundi
- Common systems
- Ponds, Cages, RAS (recirculating)
- Water temperature
- 26–32 °C
- Industrial electricity
- USD 0.07 / kWh
- Water cost
- ≈ USD 0.60 / m³
- Compound feed
- ≈ IDR 21,190 (≈ $1) / kg
- VAT / GST on equipment
- 11%
- Currency
- IDR (≈ 16300 / USD)
- Licensing authority
- Ministry of Marine Affairs and Fisheries (KKP)
- Main import ports
- Tanjung Priok, Tanjung Perak and Belawan
What to check before requesting quotes in Indonesia
- Confirm your water source and year-round temperature (26–32 °C) for shrimp.
- Budget energy carefully: at about USD 0.07/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Ministry of Marine Affairs and Fisheries (KKP).
- Plan equipment logistics and lead times through Tanjung Priok, Tanjung Perak and Belawan.
- Check water rights or tariffs: municipal water costs about USD 0.60 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 11% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Indonesia?
An indicative 250-tonne-per-year RAS in Indonesia costs roughly IDR 31.2B (≈ $1.9M) – IDR 48.5B (≈ $3M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Indonesia?
Commercial projects in Indonesia mainly focus on shrimp, tilapia, pangasius, barramundi.
Who licenses aquaculture in Indonesia?
Licensing and environmental approval usually involve Ministry of Marine Affairs and Fisheries (KKP). Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Thailand
- Philippines
- Malaysia
- Australia