Aquaculture market guide

Aquaculture in Oman: suppliers, costs and project planning

FishMatch Group helps commercial buyers in Oman source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are shrimp, seabream, barramundi; typical water temperatures are 22–33 °C and industrial electricity costs about USD 0.19 per kWh.

Oman's aquaculture strategy designates coastal zones for shrimp, marine cages and RAS, supported by Fisheries Development Oman.

Key planning facts

Main species
shrimp, seabream, barramundi
Common systems
Ponds, Cages, RAS (recirculating)
Water temperature
22–33 °C
Industrial electricity
USD 0.19 / kWh
Water cost
≈ USD 2.00 / m³
Compound feed
≈ OMR 1 (≈ $2) / kg
VAT / GST on equipment
5%
Currency
OMR (≈ 0.385 / USD)
Licensing authority
Ministry of Agriculture, Fisheries and Water Resources
Main import ports
Sohar, Duqm and Salalah

What to check before requesting quotes in Oman

  1. Confirm your water source and year-round temperature (22–33 °C) for shrimp.
  2. Budget energy carefully: at about USD 0.19/kWh, pumping and aeration are a major operating cost.
  3. Start permits and environmental licensing early with Ministry of Agriculture, Fisheries and Water Resources.
  4. Plan equipment logistics and lead times through Sohar, Duqm and Salalah.
  5. Check water rights or tariffs: municipal water costs about USD 2.00 per m³, so RAS make-up water and pond filling need a secured source.
  6. Budget taxes: standard VAT/GST is 5% on equipment; ask about import duty exemptions for aquaculture.

Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.

Frequently asked questions

How much does a fish farm cost in Oman?

An indicative 250-tonne-per-year RAS in Oman costs roughly OMR 909,563 (≈ $2.4M) – OMR 1.4M (≈ $3.7M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.

Which fish and shrimp are farmed in Oman?

Commercial projects in Oman mainly focus on shrimp, seabream, barramundi.

Who licenses aquaculture in Oman?

Licensing and environmental approval usually involve Ministry of Agriculture, Fisheries and Water Resources. Requirements change, so confirm with the authority before committing capital.

Does FishMatch Group sell equipment?

No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.

More Oman questions: see the market FAQ

This page in other languages

Other aquaculture markets

Start a reviewed RFQ