Aquaculture market guide

Aquaculture in Denmark: suppliers, costs and project planning

FishMatch Group helps commercial buyers in Denmark source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are trout, salmon; typical water temperatures are 4–18 °C and industrial electricity costs about USD 0.23 per kWh.

Denmark pioneered model-trout-farm recirculation and is home to leading RAS engineering firms. Nitrogen discharge rules shape system design.

Key planning facts

Main species
trout, salmon
Common systems
RAS (recirculating), Flow-through raceways, Cages
Water temperature
4–18 °C
Industrial electricity
USD 0.23 / kWh
Water cost
≈ USD 6.00 / m³
Compound feed
≈ DKK 11 (≈ $2) / kg
VAT / GST on equipment
25%
Currency
DKK (≈ 6.8 / USD)
Licensing authority
Danish Fisheries Agency and Danish Environmental Protection Agency
Main import ports
Aarhus, Esbjerg and Hirtshals
See vetted supplier categories for Denmark

What to check before requesting quotes in Denmark

  1. Confirm your water source and year-round temperature (4–18 °C) for trout.
  2. Budget energy carefully: at about USD 0.23/kWh, pumping and aeration are a major operating cost.
  3. Start permits and environmental licensing early with Danish Fisheries Agency and Danish Environmental Protection Agency.
  4. Plan equipment logistics and lead times through Aarhus, Esbjerg and Hirtshals.
  5. Check water rights or tariffs: municipal water costs about USD 6.00 per m³, so RAS make-up water and pond filling need a secured source.
  6. Budget taxes: standard VAT/GST is 25% on equipment; ask about import duty exemptions for aquaculture.

Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.

Frequently asked questions

How much does a fish farm cost in Denmark?

An indicative 250-tonne-per-year RAS in Denmark costs roughly DKK 19.1M (≈ $2.8M) – DKK 29.8M (≈ $4.4M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.

Which fish and shrimp are farmed in Denmark?

Commercial projects in Denmark mainly focus on trout, salmon.

Who licenses aquaculture in Denmark?

Licensing and environmental approval usually involve Danish Fisheries Agency and Danish Environmental Protection Agency. Requirements change, so confirm with the authority before committing capital.

Does FishMatch Group sell equipment?

No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.

More Denmark questions: see the market FAQ

This page in other languages

Other aquaculture markets

Start a reviewed RFQ