Aquaculture market guide
Aquaculture in Colombia: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Colombia source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are tilapia, trout, shrimp; typical water temperatures are 14–30 °C and industrial electricity costs about USD 0.20 per kWh.
Colombia exports tilapia fillets to the US from reservoir cages and ponds in Huila and has growing trout and shrimp segments.
Key planning facts
- Main species
- tilapia, trout, shrimp
- Common systems
- Ponds, Cages, RAS (recirculating)
- Water temperature
- 14–30 °C
- Industrial electricity
- USD 0.20 / kWh
- Water cost
- ≈ USD 1.50 / m³
- Compound feed
- ≈ COP 4,920 (≈ $1) / kg
- VAT / GST on equipment
- 19%
- Currency
- COP (≈ 4100 / USD)
- Licensing authority
- AUNAP and ICA
- Main import ports
- Cartagena, Barranquilla and Buenaventura
What to check before requesting quotes in Colombia
- Confirm your water source and year-round temperature (14–30 °C) for tilapia.
- Budget energy carefully: at about USD 0.20/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with AUNAP and ICA.
- Plan equipment logistics and lead times through Cartagena, Barranquilla and Buenaventura.
- Check water rights or tariffs: municipal water costs about USD 1.50 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 19% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Colombia?
An indicative 250-tonne-per-year RAS in Colombia costs roughly COP 7.8B (≈ $1.9M) – COP 12.2B (≈ $3M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Colombia?
Commercial projects in Colombia mainly focus on tilapia, trout, shrimp.
Who licenses aquaculture in Colombia?
Licensing and environmental approval usually involve AUNAP and ICA. Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia