Aquaculture market guide
Aquaculture in Iceland: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Iceland source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are salmon, trout; typical water temperatures are 4–12 °C and industrial electricity costs about USD 0.09 per kWh.
Iceland combines cheap geothermal and hydro power with clean water, making it a leading location for large land-based salmon RAS.
Key planning facts
- Main species
- salmon, trout
- Common systems
- RAS (recirculating), Cages, Flow-through raceways
- Water temperature
- 4–12 °C
- Industrial electricity
- USD 0.09 / kWh
- Water cost
- ≈ USD 1.00 / m³
- Compound feed
- ≈ ISK 235 (≈ $2) / kg
- VAT / GST on equipment
- 24%
- Currency
- ISK (≈ 138 / USD)
- Licensing authority
- Food and Veterinary Authority (MAST) and Environment Agency
- Main import ports
- Reykjavík and Þorlákshöfn
What to check before requesting quotes in Iceland
- Confirm your water source and year-round temperature (4–12 °C) for salmon.
- Budget energy carefully: at about USD 0.09/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with Food and Veterinary Authority (MAST) and Environment Agency.
- Plan equipment logistics and lead times through Reykjavík and Þorlákshöfn.
- Check water rights or tariffs: municipal water costs about USD 1.00 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 24% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Iceland?
An indicative 250-tonne-per-year RAS in Iceland costs roughly ISK 403.7M (≈ $2.9M) – ISK 627.9M (≈ $4.6M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Iceland?
Commercial projects in Iceland mainly focus on salmon, trout.
Who licenses aquaculture in Iceland?
Licensing and environmental approval usually involve Food and Veterinary Authority (MAST) and Environment Agency. Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Peru
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia