Aquaculture market guide
Aquaculture in Peru: suppliers, costs and project planning
FishMatch Group helps commercial buyers in Peru source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are trout, shrimp, tilapia; typical water temperatures are 10–28 °C and industrial electricity costs about USD 0.16 per kWh.
Lake Titicaca trout cages and Tumbes shrimp ponds are Peru's two main segments; Amazonian species offer additional freshwater opportunities.
Key planning facts
- Main species
- trout, shrimp, tilapia
- Common systems
- Cages, Ponds, RAS (recirculating)
- Water temperature
- 10–28 °C
- Industrial electricity
- USD 0.16 / kWh
- Water cost
- ≈ USD 1.40 / m³
- Compound feed
- ≈ PEN 5 (≈ $1) / kg
- VAT / GST on equipment
- 18%
- Currency
- PEN (≈ 3.7 / USD)
- Licensing authority
- PRODUCE and SANIPES
- Main import ports
- Callao and Paita
What to check before requesting quotes in Peru
- Confirm your water source and year-round temperature (10–28 °C) for trout.
- Budget energy carefully: at about USD 0.16/kWh, pumping and aeration are a major operating cost.
- Start permits and environmental licensing early with PRODUCE and SANIPES.
- Plan equipment logistics and lead times through Callao and Paita.
- Check water rights or tariffs: municipal water costs about USD 1.40 per m³, so RAS make-up water and pond filling need a secured source.
- Budget taxes: standard VAT/GST is 18% on equipment; ask about import duty exemptions for aquaculture.
Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.
Frequently asked questions
How much does a fish farm cost in Peru?
An indicative 250-tonne-per-year RAS in Peru costs roughly PEN 7.1M (≈ $1.9M) – PEN 11M (≈ $3M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.
Which fish and shrimp are farmed in Peru?
Commercial projects in Peru mainly focus on trout, shrimp, tilapia.
Who licenses aquaculture in Peru?
Licensing and environmental approval usually involve PRODUCE and SANIPES. Requirements change, so confirm with the authority before committing capital.
Does FishMatch Group sell equipment?
No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.
This page in other languages
Other aquaculture markets
- United States
- Canada
- Mexico
- Brazil
- Chile
- Ecuador
- Spain
- Italy
- Greece
- Norway
- United Kingdom
- Netherlands
- Germany
- Denmark
- Türkiye
- Egypt
- Saudi Arabia
- Vietnam
- India
- France
- Portugal
- Poland
- Croatia
- Romania
- Faroe Islands
- Colombia
- Argentina
- Honduras
- Costa Rica
- Guatemala
- Panama
- Dominican Republic
- Oman
- Qatar
- Tunisia
- Tanzania
- Uganda
- Taiwan
- Ireland
- Belgium
- Switzerland
- Austria
- Iceland
- Sweden
- Cyprus
- Morocco
- United Arab Emirates
- Kuwait
- Nigeria
- Ghana
- Kenya
- South Africa
- Senegal
- Indonesia
- Thailand
- Philippines
- Malaysia
- Australia