Aquaculture market guide

Aquaculture in Morocco: suppliers, costs and project planning

FishMatch Group helps commercial buyers in Morocco source aquaculture equipment and complete farm projects through a private, human-reviewed RFQ process. Key species are seabass, seabream, shrimp, tilapia; typical water temperatures are 15–24 °C and industrial electricity costs about USD 0.11 per kWh.

Morocco's ANDA offers planned aquaculture zones on the Atlantic and Mediterranean coasts for cage fish, shellfish and new shrimp projects.

Key planning facts

Main species
seabass, seabream, shrimp, tilapia
Common systems
Cages, RAS (recirculating), Ponds
Water temperature
15–24 °C
Industrial electricity
USD 0.11 / kWh
Water cost
≈ USD 1.00 / m³
Compound feed
≈ MAD 15 (≈ $2) / kg
VAT / GST on equipment
20%
Currency
MAD (≈ 10 / USD)
Licensing authority
National Agency for Aquaculture Development (ANDA)
Main import ports
Tanger Med, Casablanca and Agadir
See vetted supplier categories for Morocco

What to check before requesting quotes in Morocco

  1. Confirm your water source and year-round temperature (15–24 °C) for seabass.
  2. Budget energy carefully: at about USD 0.11/kWh, pumping and aeration are a major operating cost.
  3. Start permits and environmental licensing early with National Agency for Aquaculture Development (ANDA).
  4. Plan equipment logistics and lead times through Tanger Med, Casablanca and Agadir.
  5. Check water rights or tariffs: municipal water costs about USD 1.00 per m³, so RAS make-up water and pond filling need a secured source.
  6. Budget taxes: standard VAT/GST is 20% on equipment; ask about import duty exemptions for aquaculture.

Electricity: GlobalPetrolPrices business tariffs (2026). Water tariffs and exchange rates are estimates; VAT is the standard national rate.

Frequently asked questions

How much does a fish farm cost in Morocco?

An indicative 250-tonne-per-year RAS in Morocco costs roughly MAD 21.4M (≈ $2.1M) – MAD 33.3M (≈ $3.3M) in equipment and installation, before land and buildings. Ponds and cages usually cost less per tonne. Use the calculator for your species and scale, then request supplier quotes.

Which fish and shrimp are farmed in Morocco?

Commercial projects in Morocco mainly focus on seabass, seabream, shrimp, tilapia.

Who licenses aquaculture in Morocco?

Licensing and environmental approval usually involve National Agency for Aquaculture Development (ANDA). Requirements change, so confirm with the authority before committing capital.

Does FishMatch Group sell equipment?

No. FishMatch Group is an independent, human-reviewed sourcing service. We qualify your project, match it with vetted suppliers and keep supplier details private until an introduction is approved.

More Morocco questions: see the market FAQ

This page in other languages

Other aquaculture markets

Start a reviewed RFQ