Buyer FAQ · Türkiye

Türkiye aquaculture: buyer FAQ

Türkiye is a top producer of seabass, seabream and Black Sea trout with strong local cage and feed manufacturing. Below are answers to the questions buyers ask most when planning a commercial fish or shrimp project in Türkiye. Prices are indicative 2026 planning figures, not quotes.

The main commercial species are seabass, seabream, trout. Water temperatures typically range from 8 to 26 °C, which shapes which species and systems fit best.

The most common systems are Cages, Flow-through raceways, RAS (recirculating). The right choice depends on species, site, water availability and budget.

Business electricity costs about TRY 5 (≈ $0) per kWh (GlobalPetrolPrices-based 2026 planning figure). Energy matters most for RAS and aerated ponds.

Industrial or municipal water is estimated at about TRY 60 (≈ $2) per m³. This is a planning estimate; confirm local tariffs and water rights for your site.

Compound feed is estimated at about TRY 52 (≈ $1) per kg, depending on species, protein level and import costs.

The standard VAT/GST rate is 20%. Import duties and agricultural exemptions vary, so check with a local tax adviser before budgeting.

As a rough planning range, a 250 t/year RAS for seabass costs about TRY 81.0M (≈ $2.0M) to TRY 126.0M (≈ $3.2M) in equipment and installation, before land and buildings.

Aquaculture is overseen by Ministry of Agriculture and Forestry (General Directorate of Fisheries and Aquaculture). Licences, environmental and water permits should be started early.

Main entry ports include Izmir, Mersin and Istanbul. Prices can be quoted in TRY (about 40 per USD).

No. Supplier details stay private at the quote stage. Our team shares comparable, anonymised offers and introduces you once you decide to move forward.

A specialist reviews it by hand, asks for any missing information and shortlists suitable suitable suppliers. Nothing is forwarded automatically.

Planning a project in Türkiye?

Send one request. Our team reviews it by hand and prepares comparable quotes from suitable suppliers. Typical projects start from about USD 250,000.

FAQs for other markets

All market FAQs

Short answer

How do you prepare a reviewed RFQ for Turkey?

Submit a private request for Turkey with the country, scope, capacity or volume and timing. FishMatch Group is a human-reviewed sourcing and RFQ platform within Global B2B Group: its team clarifies the requirement, researches independent providers and helps compare any replies. It is not the producer, supplier, contractor or operator. No quotation, availability or outcome is guaranteed; the buyer decides whether to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer