← All countries

Aquaculture equipment manufacturers & suppliers in China.

Looking to buy fish farming equipment in China? FishMatch sources RAS, cage, pond, shrimp, hatchery, feeding, aeration, water treatment and complete turnkey equipment from project-matched manufacturers and distributors serving Asia.

1 req
Multiple suppliers
0%
Buyer fees
1 day
First human response
Asia
Regional coverage

Short answer

Where do you find aquaculture equipment suppliers in China?

Buyers in China normally source through three routes: direct manufacturers, regional distributors and turnkey EPC contractors. FishMatch Group runs all three in one confidential RFQ — you send a single brief, we approach project-matched suppliers serving China and the wider Asia region, and you receive comparable quotations on identical scope once suppliers respond. Supplier identities remain confidential throughout the process, and buyers pay no platform fee.

The service suits commercial and industrial projects — new farms, expansions, hatcheries, processing lines and equipment replacement. It is not a retail catalogue and we do not publish supplier contact details.

Coverage:
China and the wider Asia region
Categories:
RAS, cage, pond, shrimp, hatchery, feed, aeration, water treatment, processing, turnkey
Typical timing:
Response times vary; comparable quotes as suppliers respond
Cost to buyer:
Free — suppliers cover the sourcing fee
Price factors:
Scope, capacity, certification, freight and installation terms
Limitations:
Commercial projects only; indicative budgets are not engineered quotes

China aquaculture production: evidence for your project brief

FAO FishStat, release 2025.1.0; reporting year 2023. National historical production is context, not supplier availability, site suitability, project yield or a cost estimate.

The published explorer records approximately 78,276,941 tonnes for China in 2023, across reported aquaculture groups, including aquatic plants where recorded.

Five-year comparison: 66,135,059 tonnes in 2018 versus 78,276,941 tonnes in 2023. These are exact reporting-year endpoints; missing years are not interpolated.

Largest reported groups in China, 2023
FAO species groupRounded tonnesSource flags
Carps, barbels and other cyprinids20,746,456No flag
Brown seaweeds15,387,033I
Red seaweeds7,565,610No flag
Oysters6,671,197No flag

Flags from FAO: E = FAO estimate, I = imputed, N = not significant (<0.5 t), B = series break. No flag = official value. Totals sum the explorer’s rounded group quantities; small rounding differences from the underlying FAO file are possible.

What this changes in a China RFQ

Confirm your actual species and life stage rather than using a national group as a design target. Carps, barbels and other cyprinids is the largest reported group here, but this does not establish that your species, system or equipment is locally available. Supply water analysis, peak biomass and feed load, power reliability, site survey and written installation responsibilities for project-specific review.

FAO. Fishery and Aquaculture Statistics. Global aquaculture production (release 2025.1.0). FishStat. Rome. Licence: CC BY 4.0. Source file dated 2025-03-27; retrieved 2026-10-17 13:31 UTC.

China market focus

Aquaculture in China: what buyers are sourcing.

Largest aquaculture producer worldwide.

Top farmed species in China include carp, shrimp, tilapia. FishMatch Group runs a private, anonymized sourcing process for RAS systems, cages, ponds, hatcheries, feed & aeration equipment and full turnkey projects serving China and the wider East Asia region.

carpshrimptilapia
What buyers in China look for

Aquaculture equipment manufacturers and suppliers in China

Buyers search for Chinese aquaculture equipment manufacturers and distributors because China makes much of the world's aerators, drum filters, tanks, feeders, pumps, oxygen generators and RAS parts at lower prices. The risk is quality and after-sales service, so compare materials, motor brands, warranty, factory testing and who will install and repair the equipment in your country.

  • Compare factory direct and distributor quotes on the same scope
  • Check materials, motors, certificates and factory tests
  • Agree spare parts and remote support before paying

China market facts

Production
About 54.6 million t farmed in 2022 — the world's largest producer · source
Split
~32.9 million t inland, ~20 million t marine (2022) · source
Main farmed species
Freshwater carps, shellfish (oysters, clams) and shrimp
Main export ports
Shanghai, Ningbo-Zhoushan, Shenzhen, Qingdao, Tianjin
Regulator
Ministry of Agriculture and Rural Affairs — Bureau of Fisheries · source

Typical equipment prices for China projects

EquipmentPublic price rangeSource
Paddlewheel aerator, 2 HPCommon in ChinaUSD 300 – 1,250 per unitFactory listing (USD 299) to US retail (USD 1,250)
Drum filter, 30–100 m³/hCommon in ChinaUSD 1,250 – 3,540Public drum filter price list
PSA oxygen generator for fish farmsCommon in ChinaUSD 5,000 – 40,000 by capacityManufacturer price listings
Automatic pond feeder (40–120 kg hopper)Common in ChinaUSD 85 – 900 per unitManufacturer price listings
HDPE floating fish cage (small to mid)USD 2,000 – 10,000 per cageManufacturer price listings
Commercial RAS, equipment + installationUSD 9,000 – 25,000 per tonne of yearly capacityRAStech capital cost study

Planning estimate only: public list prices, before shipping to China, import duty, installation and local taxes. Your quote depends on capacity and scope.

Sourcing equipment in China — how it works.

  1. 01

    Local + global match

    Suppliers serving China and regional manufacturers shortlisted.

  2. 02

    Qualification

    Scope, warranty and after-sales terms reviewed on available information; project references requested. Qualification is not certification or a performance guarantee.

  3. 03

    Logistics

    Shipping into China, customs and duties handled by the supplier or logistics partner where included in the quote; import clearance remains the buyer's responsibility.

  4. 04

    Installation

    Installation, commissioning, operator training and after-sales support are performed by the supplier or its EPC partner where included in the quote.

Equipment we source in China

Financing in China

Need financing for your project in China?

Qualified projects in China may be introduced to independent third-party equipment, turnkey or expansion financing providers. Approval and terms are set solely by the provider.

Check financing
Buyer guide

Fish Farming Suppliers in China: Aquaculture Procurement

Local and international suppliers can both serve projects in China. Before comparing them, put every quote on the same basis.

  1. 1.Write one specification first

    Species, target tonnes per year, system type, site, water source and budget. Quotes built on the same brief can be compared line by line; quotes built on different assumptions cannot.

  2. 2.Ask for the same delivery terms

    Request every price on the same Incoterms® 2020 rule (for example FOB or CIF, named port). Mixed terms hide freight, insurance and duty differences (ICC).

  3. 3.Separate equipment from design and installation

    Ask suppliers to price equipment, engineering, installation supervision, commissioning and training as separate lines, so missing scope is visible.

  4. 4.Check the technical basis

    For RAS, ask how flow, oxygen and biofilter capacity were sized from the feed load — the method in Timmons & Ebeling is a common reference.

  5. 5.Confirm certification needs early

    If your buyers require ASC or BAP, tell suppliers before design and check the applicable standard. FAO's certification guidelines provide a broader reference for environmental, social, food-safety and animal-health criteria; they do not certify a supplier or a project.

  6. 6.Compare total cost, not unit price

    Include spares, warranty terms, currency, payment milestones and lead time. The lowest equipment price is not always the lowest project cost.

How FishMatch Group handles aquaculture procurement

A specialist reviews your brief, asks for anything missing, then contacts relevant suppliers privately. Available proposals are organised in one comparison, line by line, with differences and exclusions identified. FishMatch Group is supplier-neutral: it does not manufacture equipment, build or operate farms, or lend. Supplier names, websites and contact details stay confidential. We do not guarantee a number of proposals, the lowest price or financing approval.

Open the RFQ form →

Planning a shrimp farm? Get a free cost estimate from your pond size, stocking density and harvest goals

Sources

Structured intake

Full RFQ intake for your aquaculture project

Human-reviewed infrastructure RFQs start at USD 250,000. Buyers pay nothing; sourcing is supplier-funded. Define species, capacity, system, measured water conditions, equipment scope, standards, destination, timing and budget. Supplier identities remain confidential. Smaller requests are saved separately and directed to free planning tools.

Your details are never published and never shared with a supplier under your name without approval.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Step 1 of 5

1. Contact

1. Contact

Your contact details stay private and let our team clarify the project before any supplier outreach.

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

FAQ — Aquaculture equipment in China

Distributors and dealers active in China are usually regional agents for international manufacturers of aeration, pumping, feeding, filtration and monitoring equipment. FishMatch Group researches those companies from public information, then approaches the ones whose product range and service coverage match your project. We are not a distributor ourselves and do not sell equipment.

Commercial buyers in China normally buy directly from manufacturers or from their regional distributors rather than from retail outlets. You send one brief describing species, capacity and site conditions; we prepare a technical RFQ and run a confidential round with manufacturers, exporters and distributors that already ship to Asia.

Yes. Requests are put to manufacturers, wholesalers, exporters and turnkey contractors, selected by capability for your system type rather than by any commercial relationship. Quotes come back in a comparable format with scope, lead time and delivered cost to China stated the same way.

Submit one sourcing brief with your species, system and capacity. FishMatch Group matches it against manufacturers, exporters and distributors already serving China and Asia, then returns comparable quotes — you never have to contact suppliers one by one.

Cost depends on system type and scale rather than location: small pond or cage setups typically start in the tens of thousands of USD, while commercial RAS and turnkey farms run from several hundred thousand to multi-million USD. Landed cost in China also includes freight, duties, installation and commissioning — all of which are itemised in the quotes you receive.

Stock items and small equipment usually ship in 2–6 weeks. Engineered RAS, hatchery and processing lines are typically 8–20 weeks from order confirmation, plus 3–6 weeks of sea freight and customs clearance into China.

Yes. The manufacturers we work with export regularly to Asia and quote door-to-door where required, covering sea or air freight, customs documentation, on-site installation, commissioning and operator training in China.

We check company registration, export history into Asia, reference projects of comparable scale, certifications and after-sales capability before a supplier is matched to a China project. Supplier identities stay confidential until you decide to proceed.

There is no fixed minimum, but sourcing works best for projects above roughly USD 25,000. Smaller orders are usually matched with regional distributors serving China rather than factory-direct manufacturers.

Qualified projects in China may be eligible for equipment leasing, export credit, working capital or structured project finance from USD 250,000 upwards through our international financing partners. Financing is reviewed confidentially alongside your equipment quotes.

We prioritise suppliers with regional service coverage or a distributor presence in Asia, and spare-parts availability, warranty terms and remote support are compared as part of every quote package for China.

Nothing. Buyers in China pay no fee for sourcing, quote comparison or financing introductions — suppliers cover the fee only when a qualified opportunity is delivered.

Most complete briefs receive 2–3 matched supplier quotes once suppliers respond. Complex turnkey or RAS projects in China take longer because they require engineered scopes and layout drawings; timing depends on supplier response.

RAS and post-smolt systems, sea and lake cages, lined and earthen ponds, biofloc and shrimp systems, hatchery and nursery lines, feed handling, aeration and oxygenation, water treatment, cold chain and processing equipment are all sourced for projects in China and across Asia.

No. You submit a single brief and we run the outreach, technical clarification and price negotiation with matched manufacturers on your behalf. Supplier identities stay confidential until you decide which quote to progress for your China project.

Yes. Turnkey scopes covering process design, civil interface, equipment supply, installation, commissioning and operator training are quoted by EPC partners with delivery experience in Asia, so the China package arrives as one comparable price rather than a dozen separate line items.

Species, target annual tonnage, site water source and quality, available land or sea area, power availability and a target start date are enough to begin. Site drawings, permits and water analyses for China sharpen the engineered scope but are not required for the first round of quotes.

We match suppliers whose equipment, certification and documentation meet the standards enforced in China and Asia, and quotes include the technical files, CE or equivalent conformity documents and effluent or biosecurity specifications your permitting process is likely to request.

Every quote is returned in a comparable format: equipment scope, capacity assumptions, energy and labour requirements, Incoterm and freight to China, installation, warranty, spare parts and payment terms — so you compare total delivered cost of ownership instead of headline equipment price.

Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.

Directory — research

Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.

Project sourcing — RFQ

Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.

  • FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
  • Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
  • Buyer follow-up and supplier selection are handled by FishMatch.

There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.

Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Commercial project route

Is your project in China a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

More on China

Each page answers a different stage of the same project — market, suppliers, feasibility and equipment.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.