RAS Systems in China

Source ras from aquaculture equipment manufacturers assessed against your project brief and available evidence for delivery to China. Recirculating Aquaculture Systems with mechanical filtration, biofilters, UV/ozone disinfection, oxygenation and full process control for high-density indoor production.

Project-matched manufacturers
Compared on available export evidence, references, warranty and service plans relevant to China.
Defined delivery scope
Shipping, customs and installation responsibilities are stated in the RFQ and compared explicitly.
No buyer fees
Suppliers pay our fee — never you.

Typical ras systems sourced for China

  • Drum filters
  • Moving-bed biofilters
  • Degassers
  • Oxygen cones
  • PLC control

RAS in other key markets

More for buyers in China

FAQ

Pricing depends on production capacity, technical duty, automation, materials, delivery and installation scope. Submit the site and project specification so FishMatch can seek comparable responses from relevant manufacturers serving China; availability depends on scope and supplier interest.

International manufacturers may quote delivery to China, subject to project scope and their current market coverage. The RFQ should state the delivery point, Incoterm, customs responsibility, installation boundary and local-service requirement.

Eligible projects may be introduced to independent third-party equipment-leasing and export-credit providers. FishMatch Group is not a lender; availability, terms and approval are determined solely by the provider.

No. Buyers pay no fee, and suppliers cannot pay for ranking or shortlist position.
FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
Step 1 of 6Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Short answer

How do you source China for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for China, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.