Aquaculture Calculators & Buyer Tools
Free, supplier-neutral tools that turn scoping questions into bank-quality numbers. Every result feeds directly into your RFQ package.
Aquaculture calculators help organise early assumptions about production capacity, water, tanks, feed, oxygen, energy, equipment and operating requirements. Results remain preliminary and must be reviewed against species biology, site conditions, engineering requirements and local regulation. You can also explore the Global B2B Group guide to free project calculators and RFQ tools, or the FishMatch overview of free aquaculture project calculators.
Sizing & production planning
Right-size your farm before you spec equipment.
Size a RAS loop: system volume, make-up water, biofilter and oxygen from target biomass.
Shrimp farm
Biomass
Stocking density
Round tank volume
Pond volume
Water, oxygen & filtration
Design the life-support envelope every RFQ must specify.
Feed & growth
Model FCR, feed budget and harvest schedule.
CAPEX, OPEX & ROI
Bank-quality numbers for board memos and financing packs.
Commercial CAPEX
Commercial ROI/IRR
Project ROI
Monthly OPEX
Annual energy $
Loan / DSCR
Processing & cold chain
Size processing throughput and cold storage.
Power, backup & renewables
Backup power, solar payback, battery storage.
Total kW load
Genset kVA
Battery kWh
Solar payback
Solar payback (full)
Solar pump PV
Pump sizing
Short answer
How do you size and cost Tools?
Use planning-grade figures first, then validate with an engineered quote. The Tools model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.
- Accuracy:
- Planning-grade benchmarks, not engineering design figures
- Cost:
- Free, no sign-up, calculated in your browser
- Next step:
- Send the result straight into a pre-filled RFQ
- Validation:
- Confirm with a site survey and a costed supplier quote
How do you size and cost Tools?
Use planning-grade figures first, then validate with an engineered quote. The Tools model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.
How does FishMatch Group source suppliers for this requirement?
You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.
Do buyers see supplier names during the sourcing process?
No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.