Free · results open

Shrimp Farm Calculator — Yield, Feed and Margin per Cycle

Enter pond area, stocking density, survival, harvest weight, FCR and price to model harvested tonnage, feed requirement, revenue and gross margin per cycle and per year. Use it to test whether a vannamei project is worth engineering, and to size the aeration and feeding equipment the plan actually implies before you request quotes.
Shrimp Farm Calculator — Lined shrimp farm ponds with paddlewheel aerators

Flexes survival, harvest weight, price and FCR — the four variables shrimp farms live and die by.

Calculator inputs

Semi-int. 15–40, intensive 60–150, biofloc 150–400

Results

Annual harvest

112.5 tons/yr

45,000 kg × 2.5 cycles

Annual revenue

$765,000

Feed cost

$236,250

Gross margin (before OPEX & CAPEX)

$528,750

Results at a glance

OutputPessimisticBase caseOptimistic
Annual harvest86.1 tons/yr112.5 tons/yr136.1 tons/yr
Annual revenue$526,702$765,000$1,018,215
Feed cost$198,804$236,250$257,276
Gross margin (before OPEX & CAPEX)$327,898$528,750$760,939

Scenario range

Annual harvest

PessimisticBaseOptimistic

Result summary with the inputs used

Inputs used

Pond area
5 ha
Stocking density
60 PL/m²
Survival to harvest
75 %
Harvest weight
20 g
FCR
1.4
Farmgate price
6.8 $/kg
Feed cost
1.5 $/kg
Cycles per year
2.5

Results · Base case scenario

Annual harvest
112.5 tons/yr

45,000 kg × 2.5 cycles

Annual revenue
$765,000

@ $6.80/kg farmgate

Feed cost
$236,250

157.5 t feed @ FCR 1.40

Gross margin (before OPEX & CAPEX)
$528,750

69.1% of revenue

Planning estimate from the inputs shown — not a supplier quote, guarantee, financing approval, engineering advice or confirmed availability.

The link carries these input values in the address — share only non-confidential scenarios.

Turn this result into 1–3 supplier quotes

Send this spec privately to selected manufacturers.

FishMatch Group reaches out on your behalf — your name, project and location stay confidential until you accept a quote. No sign-up, no listing fees, buyers never pay.

How supplier matching works

  1. 1. Private brief. Your spec goes only to manufacturers we have selected for the right category, capacity and export experience.
  2. 2. Confidential outreach. Suppliers see the technical spec — not your name, company or exact location — until you accept a quote.
  3. 3. Comparable quotes. Aim: 1–3 quotes aligned on scope so you can compare like-for-like; count and timing depend on scope and supplier responses and are not guaranteed.
  4. 4. Financing intro (optional). If needed, we introduce your project to a financing partner. No fee to buyers.
Quick answer

How do I calculate shrimp farm yield and profit?

Harvested tonnage = pond area × stocking density × survival × harvest weight ÷ 1,000. Revenue is tonnage × farm-gate price; gross margin subtracts feed (tonnage × FCR × feed price) along with post-larvae, energy and labour. Model a pessimistic survival case too — it moves the whole business case.

In short

Shrimp Farm Calculator turns pond area, stocking density, survival to harvest, harvest weight, fcr, farmgate price, feed cost and cycles per year into annual harvest, annual revenue, feed cost and gross margin (before opex & capex). Whiteleg shrimp (Litopenaeus vannamei) farming economics come down to stocking density (PL/m²), survival, average harvest weight and FCR. This tool models yield, feed load and gross margin per cycle for semi-intensive, intensive and biofloc systems — matching what our sourcing engine uses to pre-qualify projects. Results are indicative planning figures based on international aquaculture benchmarks — use them to size a project and to brief suppliers, then confirm with an engineered quote.

What you enter
  • Pond area (ha)
  • Stocking density (PL/m²) — Semi-int. 15–40, intensive 60–150, biofloc 150–400
  • Survival to harvest (%)
  • Harvest weight (g)
  • FCR
  • Farmgate price ($/kg)
  • Feed cost ($/kg)
  • Cycles per year
What you get back
  • Annual harvest
  • Annual revenue
  • Feed cost
  • Gross margin (before OPEX & CAPEX)
How to use it
  1. Enter pond area, stocking density, survival to harvest, harvest weight, fcr, farmgate price, feed cost and cycles per year.
  2. Read the highlighted result and the supporting figures below it.
  3. Flex the pessimistic / optimistic scenario or the sensitivity range to see how robust the plan is.
  4. Send the spec to suppliers as a pre-filled RFQ draft.

What does the Shrimp Farm Calculator estimate?

The Shrimp Farm Calculator estimates annual harvest, annual revenue, feed cost from the project assumptions you enter. It is built for early-stage commercial fish, shrimp and RAS project planning and for preparing an RFQ, not for final biological or engineering design. Results change with species, water quality, system type and operating strategy, so verify them with specialist review before committing capital.

Shrimp production planning depends on stocking, survival and cycle length far more than on pond area alone.

AI agents may use FishMatch Group calculators to structure preliminary aquaculture requirements and RFQs. Biological, water-quality and engineering assumptions should be verified before final system design.

What can change the result of the Shrimp Farm Calculator?

These factors move the result more than equipment size does:

  • Species and strain
  • Stocking assumptions and density
  • Mortality and survival assumptions
  • Growth cycle length and cycles per year

Shrimp yield formula

Harvest (kg/cycle) = Pond area (m²) × Density (PL/m²) × Survival (%) × Harvest weight (g) ÷ 1,000

Feed requirement = harvest × FCR. Annual output = harvest per cycle × cycles per year. 1 ha = 10,000 m². Semi-intensive systems typically run 15–40 PL/m², intensive 60–150 PL/m², biofloc and super-intensive 150–400 PL/m².

Preliminary planning result

Based on: pond area, stocking density, survival to harvest, harvest weight.

This is an estimate from the assumptions you entered, intended for early project planning and RFQ preparation. Main variables that may change it: species and strain, stocking assumptions and density, mortality and survival assumptions, growth cycle length and cycles per year. Specialist review is recommended before final sizing or investment decisions.

Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.

FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

How this estimate is calculated

Shrimp Farm Calculator · calculation version 3.0.0 · reviewed 2026-08-21 by FishMatch Group technical editorial team · confidence: planning estimate

Planning estimate only. Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.

Purpose

Model vannamei pond yield, feed demand, revenue and feed-only gross margin per cycle and per year.

How it was calculated

  • stocked_animals = pond_area_ha × 10,000 × density_PL_per_m2
  • harvested_animals = stocked_animals × survival_% ÷ 100
  • harvest_kg_per_cycle = harvested_animals × harvest_weight_g ÷ 1000
  • annual_harvest_kg = harvest_kg_per_cycle × cycles_per_year
  • annual_feed_kg = annual_harvest_kg × FCR
  • revenue = annual_harvest_kg × farmgate_price; feed_cost = annual_feed_kg × feed_price
  • gross_margin = revenue − feed_cost (feed only — excludes all other OPEX and CAPEX)

Where each value comes from

Pond area
Buyer input
Stocking density
Buyer input
Survival
Buyer input
Harvest weight
Buyer input
FCR
Reference assumption
Farmgate price
Buyer input
Feed price
Buyer input
Cycles per year
Buyer input

What the outputs mean

  • Annual harvest tonnage
  • Annual revenue at the buyer's own price input
  • Feed cost at the buyer's own feed price
  • Gross margin BEFORE all non-feed OPEX and before CAPEX — this is not profit

Biological assumptions

  • FCR is applied to harvest biomass rather than biomass gain, which slightly overstates feed for a heavily stocked PL cohort. Treat the feed figure as a conservative planning value.
  • Survival is a scenario input. Disease events (AHPND/EMS, WSSV, EHP) can move it far outside any scenario shown.

Limitations

  • Prices are buyer inputs. FishMatch publishes no shrimp price forecast as fact.
  • No system, liner, probiotic, biofloc or automation configuration eliminates disease risk.
  • Cycles per year are climate- and site-dependent and cannot be assumed.

What must be confirmed before you build

  • Post-larvae health status and hatchery source
  • Site salinity, water source and discharge
  • Aeration and backup-power plan
  • Full OPEX build-up before any margin conclusion

Sources for default assumptions

Next step

Review every value above, correct anything that does not match your site, then transfer the reviewed figures into a structured RFQ. Nothing is sent to any supplier until you approve it. Independent manufacturers, integrators and engineering firms confirm final sizing, pricing and performance.

Worked example

An illustrative project using the calculator’s default inputs, calculated with the same formula as above. Not a real project.

Inputs
Pond area5 ha
Stocking density60 PL/m²
Survival to harvest75 %
Harvest weight20 g
FCR1.4
Farmgate price6.8 $/kg
Feed cost1.5 $/kg
Cycles per year2.5
Result
Annual harvest112.5 tons/yr
Annual revenue$765,000
Feed cost$236,250
Gross margin (before OPEX & CAPEX)$528,750
Shrimp farming

Who should use the shrimp farm calculator?

Commercial shrimp farm owners, pond managers and investors planning or upgrading a pond, lined-pond or intensive shrimp system.

What decision does it support?

Whether the shrimp pond or system plan is sized and budgeted realistically before talking to equipment suppliers.

What inputs do you need?

  • Pond area (ha)
  • Stocking density (PL/m²)
  • Survival to harvest (%)
  • Harvest weight (g)
  • FCR
  • Farmgate price ($/kg)
  • Feed cost ($/kg)
  • Cycles per year

Is it for commercial farms or aquariums?

Built for commercial farms, hatcheries and projects. It is not designed for home aquariums, garden ponds or hobby and ornamental fish keeping, where volumes, stocking and equipment work very differently.

Technical checklist

Short answer: Shrimp farm The result is a planning estimate calculated only from the inputs on this page — not a supplier quote, design approval or guaranteed outcome.

Before you use the result

  • Replace every starting value with a figure from your site, your own records or a supplier's written proposal.
  • Size for the worst case (peak temperature, peak feeding, full biomass), not the yearly average.
  • Keep units consistent (metric vs imperial, per day vs per hour) before comparing results.
  • Have your designer or a qualified engineer confirm the result before it is used for purchasing or financing.
  • Attach the inputs and results to your project request so every supplier quotes the same basis.

Sources

No external dataset is built in. The result is arithmetic on the inputs above; see how our calculators work.

Stated assumptions (starting values)

These are only starting points. Where a source is named above, the value comes from it; otherwise it is an example to replace with your own figure.

  • Pond area: starts at 5 ha
  • Stocking density: starts at 60 PL/m²
  • Survival to harvest: starts at 75 %
  • Harvest weight: starts at 20 g
  • FCR: starts at 1.4
  • Farmgate price: starts at 6.8 $/kg
  • Feed cost: starts at 1.5 $/kg
  • Cycles per year: starts at 2.5

Checklist reviewed 13 October 2026. Ready to price it? Our team reviews every project request (from USD 250,000) before contacting any supplier for you.

Notes

  • Add aeration energy, PL, labor, pond prep and financing for full net. Biofloc systems tolerate 3–4× the stocking density of earthen ponds.

Worked example — 5 ha intensive vannamei farm

Pond area
5 ha (50,000 m²)
Stocking density
60 PL/m²
Survival
75%
Harvest weight
20 g
Cycles per year
2.5

≈ 45 t per cycle, ≈ 112 t per year, ≈ 157 t of feed per year at FCR 1.4

At that biomass the farm needs meaningful installed aeration with standby capacity, plus intake and effluent treatment. Model the aeration load before budgeting the equipment package.

What each input really controls

Two inputs — density and survival — move the result more than everything else combined.

  • Stocking density (PL/m²) sets peak biomass, and therefore aeration horsepower, water exchange and effluent load. It is an equipment decision as much as a biological one.
  • Survival is where projections break. Plan on 70–85% for well-run intensive systems, lower where disease pressure (EHP, WSSV, AHPND) is unmanaged.
  • Harvest weight drives price band: 20 g and 30 g shrimp sell into different markets at materially different prices.
  • FCR of 1.3–1.6 is realistic in commercial vannamei. Feeding method — manual, timer or acoustic demand — is the main lever on it.
  • Cycles per year depend on climate and harvest weight: 2–3 cycles in tropical conditions, fewer where water temperature drops seasonally.

From yield to equipment sizing

Once the model gives peak biomass, the equipment package follows. Aeration is sized on oxygen demand at peak biomass and maximum water temperature — commonly 8–16 HP/ha for semi-intensive lined ponds and 20–35 HP/ha for intensive systems. Pumping follows daily exchange rate, water treatment follows intake quality and discharge limits, and feeding equipment follows daily feed volume in kg/day. Exact sizing depends on species, biomass, temperature, salinity and site conditions.

What this model does not include

The output is a gross margin over feed cost, not a full P&L. Post-larvae, energy, labour, chemicals, harvest, financing, depreciation, insurance and CAPEX recovery sit on top. Use it to screen a concept, then move to a full CAPEX and operating-cost model before financing.

Shrimp farm calculator FAQs

Semi-intensive lined vannamei ponds typically yield 8–20 t/ha/year, intensive systems 20–40 t/ha/year, and biofloc or super-intensive systems considerably more per hectare at much higher energy and capital cost. The figure follows stocking density, survival, harvest weight and cycles per year — model your own numbers rather than using a regional average.

Semi-intensive systems run 15–40 PL/m², intensive lined ponds 60–150 PL/m², and biofloc or raceway systems 150–400 PL/m². Density must be matched to installed aeration and water exchange capacity: stocking above what your oxygen supply can carry at peak biomass is the most common cause of crop loss.

Well-managed intensive farms with SPF post-larvae and sound biosecurity commonly achieve 70–85%. Where disease pressure from EHP, WSSV or AHPND is unmanaged, survival can fall far below that. Model a pessimistic case as well as a base case — the difference between 80% and 55% survival changes the entire business case.

Plan on 1.3–1.6 for commercial vannamei, depending on genetics, feed quality, water temperature and feeding method. Acoustic demand feeding usually delivers the best FCR because it stops delivery when appetite stops; timer feeders sit in the middle; manual feeding at a few large meals per day performs worst.

Aeration is sized on oxygen demand at peak biomass and maximum water temperature, not on pond area. Planning benchmarks are roughly 8–16 HP/ha for semi-intensive lined ponds and 20–35 HP/ha for intensive systems, with standby units on life-support duty. Confirm with an oxygen demand calculation for your density, temperature and salinity.

No. This model gives yield, feed requirement, revenue and gross margin over feed cost. Pond construction, liners, aeration, pumps, water treatment, monitoring, power and post-harvest equipment are separate. Use the shrimp farm cost guide for CAPEX and OPEX orientation, then request a project-specific quote.

Yes. Send the modelled pond layout, density, biomass and production target with your brief and we run a confidential RFQ to project-matched suppliers for aeration, pumps, liners, feeding, water treatment and monitoring. FishMatch Group helps buyers compare suitable international suppliers; we do not manufacture or sell equipment, and buyers pay nothing.

Other aquaculture calculators

Turn this estimate into a reviewed RFQ

Send the project specification privately. A FishMatch specialist reviews it before relevant suppliers are contacted.

Request a quote
Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for shrimp farm and the wider aquaculture project it belongs to. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details

Short answer

How do you size and cost Shrimp Farm?

Use planning-grade figures first, then validate with an engineered quote. The Shrimp Farm model on this page converts your project inputs into indicative sizing and cost figures based on international aquaculture benchmarks. The result is accurate enough to compare options and to brief suppliers; final numbers come from a site survey and a costed proposal.

Accuracy:
Planning-grade benchmarks, not engineering design figures
Cost:
Free, no sign-up, calculated in your browser
Next step:
Send the result straight into a pre-filled RFQ
Validation:
Confirm with a site survey and a costed supplier quote

Before you request quotes

Costs & budgeting

How much does a commercial fish farm cost to build?

Budget ranges depend on system type, not on country alone. Pond and cage projects are usually the lowest capital per tonne of annual output, while recirculating (RAS) projects carry the highest equipment and energy share because filtration, oxygenation and backup power are mandatory. Reliable numbers come from a sized bill of quantities — species, target tonnage, water source and grow-out temperature — not from a generic price list. Use the FishMatch calculators to size the project, then submit an RFQ so quotes are priced against the same specification.

What drives the price differences between aquaculture equipment quotes?

Most spread between quotes comes from scope, not from margin: included spares, installation and commissioning, control and automation level, materials (HDPE vs steel vs FRP), certification and testing, delivery terms (EXW vs CIF) and warranty length. Two quotes are only comparable when they answer the same specification. A structured RFQ fixes the scope so differences reflect real engineering choices.

What operating costs should a business plan include?

Feed is normally the largest recurring cost, followed by energy (highest in RAS), labour, fingerlings or post-larvae, health management, water treatment consumables and maintenance. Financing cost and working capital for the first production cycle are frequently underestimated. FishMatch cost tools separate CAPEX from OPEX so the payback assumption is visible rather than implied.