Türkiye Shrimp Farm RFQ
Prepare a Turkish shrimp project brief around the Ministry of Agriculture and Forestry's preliminary permit and project approval, ÇED screening, a water-allocation certificate and the seed import procedure — before asking suppliers to price equipment.
For commercial projects of USD 250,000 or more. Free planning tools remain available at every project size.
Prepare your shrimp RFQHuman review · Private supplier identities · No automatic supplier routing
Local sourcing guidance for Türkiye
Approvals: preliminary permit, project approval and ÇED screening
Under the Aquaculture Regulation (Su Ürünleri Yetiştiriciliği Yönetmeliği), made under Fisheries Law No. 1380, you apply through the Ministry of Agriculture and Forestry's provincial directorate; the preliminary-permit file includes a 1:25,000 site map, a pre-study report, a water-allocation certificate and a water analysis report, and the Ministry decides within ninety days. A preliminary permit gives twelve months to prepare the project, project approval requires compliance with the ÇED (EIA) Regulation, and the Aquaculture Certificate (Su Ürünleri Yetiştiricilik Belgesi) follows once production starts. The 2022 ÇED Regulation lists aquaculture other than fish culture — crustaceans, molluscs and arthropods — in Annex II (item 56), so a shrimp project goes through ÇED screening; ask the provincial environment directorate about your site.
Site: province, water allocation and delivery to the farm
Name the province, the coastal or inland site and the water source — seawater intake, groundwater or surface water. The preliminary permit needs a water-allocation certificate from the body responsible for that source (State Hydraulic Works, DSİ, for most inland water), and a first application on a dam reservoir or gölet also needs DSİ's opinion. Provide seasonal temperature, salinity and water analyses, a winter heating plan for warm-water shrimp, intake and discharge separation and sludge handling. Name the receiving port, grid connection and backup power, and separate TRY operating costs from foreign-currency equipment, freight and duties.
Shrimp: species, seed import and nursery scope
Pacific white shrimp (Penaeus vannamei) is not native to Turkish waters, so confirm with the Ministry that the species is acceptable for your site and system before ordering equipment. Article 19 of the Aquaculture Regulation leaves the procedure for importing eggs, juveniles and broodstock to the Ministry — ask for the current import procedure, health certificates and an approved post-larvae source. Specify nursery and grow-out boundaries, aeration duty, heating, feed supply and storage; an equipment package is not a guaranteed survival or yield.
Evidence to include in your private brief
- Province or state, site coordinates, land rights, approval status and unresolved authority questions.
- Shrimp species and life stage; seed and health-document requirements; nursery and grow-out boundaries.
- Land in ha, water volume in m³, measured pumping flow in m³/h at total head, target biomass in kg and harvest in tonnes/year.
- Seasonal water tests, intake and discharge, sludge handling, power in kW, energy in kWh and emergency backup.
- Budget and currency, delivery point, installation, spares, training, acceptance tests and explicit exclusions.
Calculator outputs are scenarios, not local prices, engineering specifications or guaranteed results. Use measured inputs and qualified site review.
The first human response is within one business day. Supplier quotation timing depends on the project and supplier response; no turnaround is guaranteed. Smaller requests are saved and directed to free tools, not sent to the procurement queue.
Sources and limitations
- Aquaculture Regulation (Su Ürünleri Yetiştiriciliği Yönetmeliği) — mevzuat.gov.tr
- Fisheries Law No. 1380 (Su Ürünleri Kanunu) — mevzuat.gov.tr
- ÇED (EIA) Regulation, Official Gazette 29 July 2022 No. 31907
- ÇED Regulation annex lists (Annex II item 56) — Official Gazette
- Ministry of Agriculture and Forestry — General Directorate of Fisheries and Aquaculture
- FAO Türkiye profile (sector background)
Prepared 30 October 2026 from the linked official references and existing country-guide research. FAO profiles provide historical sector context, not current approval checklists. No independent legal, native-language or aquaculture-engineering sign-off is claimed. Confirm current rules with the competent local authorities before contracting.
Short answer
What is the fastest way to get quotes for Turkey?
Submit one structured request for Turkey. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Supplier selection criteria
How should a buyer compare aquaculture suppliers?
Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.
What are the warning signs in a supplier quotation?
Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.
How does FishMatch handle supplier selection?
FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.