Türkiye · Shrimp · Cost calculator
Turkey shrimp farm cost calculator: your quotes plus official Turkish tariffs
Short answer: there is no single verified price for a shrimp farm in Türkiye. Add your own quotes for aeration, pumps, pond earthworks and liners, nursery, water treatment, feed and post-larvae, then pick the official EPDK electricity tariff, the 2026 Ministry building unit cost and the 2026 minimum-wage employer cost. The calculator shows total investment, annual operating cost and operating cost per kg of shrimp, in Turkish lira with an optional USD equivalent.
Same method as the Turkish farm cost calculator. Turkish version: Karides çiftliği maliyet hesaplayıcı. Updated 30 October 2026; official figures checked 29 October 2026.
Loading calculator…
What to collect before you enter figures
- Dated quotes with the same scope: species (usually Pacific white shrimp), system, harvest target per year and what installation, freight and commissioning include.
- Installed power and running hours from the aeration, pump and heating quotes — pond aeration usually runs day and night.
- Your distribution company's subscriber group, so the matching EPDK tariff is used.
- Post-larvae numbers per cycle (area × stocking density) and the cycles you plan per year; feed tonnes from harvest × expected FCR.
Frequently asked questions
Related guides and next step
- Shrimp farm cost guide: production figures and reported budgets
- Shrimp project cost calculator (any country, any currency)
- Shrimp farming equipment guide
- FCR calculator
- Send a shrimp project request (USD 250,000 and above)
Planning tools are free. Team-supported sourcing is for commercial projects of USD 250,000 and above; requests are reviewed by a person, there is no automatic supplier contact and supplier identities stay confidential until an introduction is approved.