Shrimp farm ponds with aeration equipment

Private commercial project request

Vietnam Shrimp Farm RFQ

Define a Vietnamese shrimp farm’s provincial approval questions, brackishwater intake, nursery and grow-out interfaces, effluent scope and delivered equipment requirements.

For commercial projects of USD 250,000 or more. Free planning tools remain available at every project size.

Prepare your shrimp RFQ

Human review · Private supplier identities · No automatic supplier routing

Local sourcing guidance for Vietnam

Confirm the provincial Fisheries Law procedure

Article 38 of the Fisheries Law (Law No. 18/2017/QH14) sets aquaculture conditions. From 1 January 2026, Law No. 146/2025/QH15 repealed Article 39 and clause 3 of Article 38, so older guidance on aquaculture certificates and licensing may no longer apply. Ask the competent provincial office, using the 2026 consolidated Fisheries Law and current implementing rules, about the selected species, land or water-surface rights, intake, discharge, environmental and seed-health obligations.

Separate shrimp designs from pangasius pond assumptions

For a Mekong Delta or other brackishwater shrimp site, submit seasonal water analyses, intake and discharge separation, nursery capacity and pond drainage. A pangasius pumping package is not a shrimp aeration design. Compare pond, partial-reuse and recirculating options against power supply, sludge handling, staff skills and local maintenance—not a promised intensification gain.

Align farm equipment with the intended harvest outlet

Specify harvest handling, chilling interfaces and the final delivery location without assuming export certification or a buyer contract. Separate VND operating costs from equipment currency, freight and installation. Require electrical compatibility, local repair arrangements, consumables, acceptance tests and a written responsibility schedule for pond works, treatment and commissioning.

Evidence to include in your private brief

  • Province or state, site coordinates, land rights, approval status and unresolved authority questions.
  • Shrimp species and life stage; seed and health-document requirements; nursery and grow-out boundaries.
  • Land in ha, water volume in m³, measured pumping flow in m³/h at total head, target biomass in kg and harvest in tonnes/year.
  • Seasonal water tests, intake and discharge, sludge handling, power in kW, energy in kWh and emergency backup.
  • Budget and currency, delivery point, installation, spares, training, acceptance tests and explicit exclusions.

Calculator outputs are scenarios, not local prices, engineering specifications or guaranteed results. Use measured inputs and qualified site review.

The first human response is within one business day. Supplier quotation timing depends on the project and supplier response; no turnaround is guaranteed. Smaller requests are saved and directed to free tools, not sent to the procurement queue.

Sources and limitations

Prepared 15 October 2026 from the linked official references and existing country-guide research. FAO profiles provide historical sector context, not current approval checklists. No independent legal, native-language or aquaculture-engineering sign-off is claimed. Confirm current rules with the competent local authorities before contracting.

Short answer

What is the fastest way to get quotes for Vietnam?

Submit one structured request for Vietnam. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Supplier selection criteria

How should a buyer compare aquaculture suppliers?

Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.

What are the warning signs in a supplier quotation?

Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.

How does FishMatch handle supplier selection?

FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.