Vietnam · Southeast Asia

Shrimp Farming in Vietnam: Law, Sites, Seed, Feed & Costs

A planning guide for commercial shrimp projects in Vietnam — the Fisheries Law as amended from 1 January 2026, provincial procedures, brackishwater siting, FAO yields by system, seed and feed supply and what drives cost. Legal statements link to official sources. Updated 31.10.2026.

Short answer

Shrimp farming in Vietnam is governed by the Fisheries Law (Law No. 18/2017/QH14), whose Article 38 sets the conditions for aquaculture. From 1 January 2026, Law No. 146/2025/QH15 repealed Article 39 and clause 3 of Article 38, so older guidance on aquaculture certificates and licensing may no longer apply; check the 2026 consolidated Fisheries Law and current implementing decrees with the provincial authority for your exact site. Plan land or water-surface rights, intake and discharge, environmental and seed-health obligations site by site. FishMatch does not quote Vietnamese farm prices; commercial projects of USD 250,000 or more can send a private request that the team reviews by hand.

Yields by system and what drives cost in Vietnam

FAO yields for whiteleg shrimp per hectare per crop (2009 technical benchmarks, not Vietnam farm data), with what each system means for a site in Vietnam. FishMatch does not publish a Vietnam price range without a verified local source.

SystemFAO yield (kg/ha/crop)StockingVietnam planning note
Extensive ponds150–5004–10 PL/m²Extensive and improved-extensive ponds depend on tidal brackishwater and seasonal salinity at the plot; measure both through wet and dry seasons.
Semi-intensive ponds500–2,00010–30 PL/m²Pumped exchange and aeration add intake, settling and discharge duties; confirm with the province how intake and effluent are handled at the site.
Intensive ponds7,000–20,00060–300 PL/m²Lined ponds with high stocking need reliable power and backup; ask suppliers to state oxygen transfer and power assumptions in writing.
Biofloc8,000–50,00080–160 PL/m²Enclosed or covered units suit nursery or constrained sites but depend on uninterrupted power and close water-quality control.

For reported shrimp project budgets elsewhere, see the shrimp farm cost guide budget bands. Size ponds with the pond volume calculator and the stocking density calculator, and see how aeration is sized in the 10-hectare shrimp pond worked example.

What drives the budget

Land or water-surface rights and earthworks

Confirm the land-use or water-surface right for aquaculture separately from any farm procedure before design.

Intake, settling, aeration and power

Set by measured salinity, the planned biomass and the grid connection or generator backup the site needs.

Post-larvae and nursery

Budget for a nursery stage and documented, health-tested seed; batch traceability belongs in the purchase terms.

Feed

State feed type, pellet sizes, protein, storage and source in the brief; convert the harvest target into annual feed with the FCR calculator.

Effluent and sludge handling

Separate intake and discharge and plan sludge removal; treatment scope depends on the provincial and environmental requirements for the site.

Currency and logistics

Separate VND operating costs from foreign-currency equipment, freight and duties, and name the receiving port and farm access.

Feed supply for shrimp in Vietnam

Commercial shrimp feed

Ask each feed source for a documented specification: protein, pellet sizes, water stability and storage life, matched to your growth stages.

Your feed brief

State feed type, pellet range, planned daily feed at peak biomass, storage and source. Use the FCR calculator to turn the harvest target into annual feed tonnage.

Convert your production target into annual feed with the FCR calculator; for import versus local sourcing, see how to source and compare aquafeed suppliers.

Where projects are sited

Mekong Delta — Ca Mau, Bac Lieu, Soc Trang

Brackishwater coastal provinces; seasonal salinity, flooding and intake-discharge separation must be measured and confirmed with the province at the plot.

Other coastal provinces

Each province handles its own site procedures; record land or water-surface rights, power and access road before asking for equipment prices.

Permits and compliance

  • • Fisheries Law (Law No. 18/2017/QH14), Article 38 — conditions for aquaculture; check the 2026 consolidated text (91/VBHN-VPQH).
  • • Law No. 146/2025/QH15 (in force 1 January 2026) repealed Article 39 and clause 3 of Article 38 of the Fisheries Law — confirm with the provincial authority which procedure now applies to your site.
  • • Land-use or water-surface rights for aquaculture, confirmed separately.
  • • Environmental, water intake and discharge obligations for the site, confirmed with the competent provincial offices.
  • • Seed and animal-health documents for post-larvae; health-testing and traceability in the purchase terms.
  • • Food-safety and export requirements from the competent authority once you chill, pack or process.

Seed sourcing: see vannamei post-larvae sourcing. Market background: Vietnam aquaculture market guide.

Financing a shrimp project in Vietnam

FishMatch Group is not a lender and does not provide credit, interest or direct funding. Where a project fits, the team can introduce it to independent financing partners, who make their own checks. Lenders generally expect a feasibility study, permit status, evidence of a buyer and an explicit contingency.

Frequently asked questions

Aquaculture must meet the conditions in Article 38 of the Fisheries Law (Law No. 18/2017/QH14). From 1 January 2026, Law No. 146/2025/QH15 repealed Article 39 and clause 3 of Article 38, so check the 2026 consolidated Fisheries Law and current implementing decrees with the provincial authority to confirm which registration or procedure applies to your exact site and species.

Mainly in brackishwater coastal provinces, including the Mekong Delta provinces of Ca Mau, Bac Lieu and Soc Trang. Every plot still needs measured salinity, flooding and intake-discharge data and confirmed land or water-surface rights.

FAO's whiteleg shrimp fact sheet (2009) gives 150–500 kg/ha/crop for extensive ponds, 500–2,000 kg for semi-intensive ponds and 7,000–20,000 kg for intensive ponds. These are general technical benchmarks, not Vietnamese farm data; your yield depends on site, seed, management and power.

No verified, published Vietnamese shrimp farm budget was used here, so no Vietnam price range is given. Cost depends on land or water-surface rights, earthworks, intake and aeration, power, seed, feed, effluent handling and logistics; compare written quotes against the same specification.

There is no fixed timeframe: it depends on the provincial authority, the site and the documents. Ask each authority for its current processing time in writing and keep equipment delivery dates conditional on the approvals.

FishMatch reviews each private request by hand before approaching any provider; supplier identities stay confidential and no connection is made automatically. Managed procurement is for projects of USD 250,000 or more; free guides and calculators are open to all.

Sources

Planning guidance only, not legal advice. Confirm every requirement with the competent authority for your exact site before committing funds.

Planning a shrimp farm in Vietnam?

Send the target tonnage, site and system through the Vietnam request page. The FishMatch team reviews every request by hand before deciding which equipment providers to approach; supplier identities stay confidential, and managed procurement is for projects of USD 250,000 or more.

Start a Vietnam shrimp RFQ

Short answer

How do you build and equip a project for Shrimp Farming In Vietnam?

Feasibility in Shrimp Farming In Vietnam is decided by water, energy, permitting and logistics before equipment choice. FishMatch Group benchmarks the local cost base, matches the system type to site conditions, and sources equipment and turn-key scopes from international suppliers who already ship and commission in the region — with landed cost, duties and lead time included in the comparison.

What decides feasibility:
Water availability, energy cost, permitting and route to market
Sourcing:
International suppliers with regional shipping and commissioning experience
Landed cost:
Quotations include freight, duties and installation assumptions
Cost to buyers:
No fee charged to the buyer