Full project development

Processing Equipment

Stunning, gutting, filleting, smoking, IQF and packaging lines.

Complete seafood processing facility development — capacity planning, food-safety design, construction and line commissioning.

Network

Project-matched processing line integrators

Process

Private & anonymized

Buyer fees

Zero

What we source

Source complete fish and shrimp processing lines — humane stunning, grading, gutting, filleting, smoking, IQF freezing, MAP packaging and traceability.

  • Humane stunning & bleeding
  • Automated gutting & filleting
  • Smoking & curing lines
  • IQF tunnel freezers
  • MAP / vacuum packaging
Beyond equipment

We develop complete commercial projects — not just equipment packages

We develop processing plants as full projects: throughput and product-mix planning, hygienic building and flow design against BRC/IFS/HACCP requirements, utilities and cold-chain integration, budget and financing, line tendering, installation supervision and commissioning with trained staff.

  1. Phase 1

    Feasibility & site assessment

    Product mix, throughput, yield targets and market/certification requirements.

  2. Phase 2

    Concept & engineering design

    Hygienic zoning, process flow, utilities, refrigeration and cold-chain design.

  3. Phase 3

    CAPEX / OPEX modelling & financing

    Line CAPEX, labour and energy OPEX, yield-based payback modelling.

  4. Phase 4

    Tendering & supplier selection

    Line and building tenders with anonymised, comparable technical offers.

  5. Phase 5

    Construction & installation

    Building works, line installation, utilities and refrigeration commissioning.

  6. Phase 6

    Commissioning, training & operations

    Validation runs, HACCP documentation, certification support and staff training.

What you receive

  • Throughput and product-mix design basis
  • Hygienic layout and process-flow drawings
  • Line CAPEX/OPEX and payback model
  • Tender package and scored line comparison
  • Certification-ready commissioning documentation

Private by design.

You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.

Start private brief

Markets we source processing equipment for

Sourcing runs the same way in every market: one structured specification, matched suppliers with real export experience for that destination, and anonymized bids priced on the same scope. Country pages below carry the local logistics, certification and installation detail.

Processing Equipment: equipment guides and planning tools

Product-type guides explain what each item does, published specification ranges and what to put in a request. Size the project with the calculators, then send one reviewed RFQ.

Related categories

Short answer

How do you source Processing for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Processing, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.