equipment

Ice Systems

Flake, tube and slurry ice systems for post-harvest cold chain.

Network

Project-matched ice-system partners

Process

Private & anonymized

Buyer fees

Zero

What we source

FishMatch Group sources ice systems for aquaculture — flake ice, tube ice, slurry / liquid ice and RSW chillers — sized to daily harvest volume and dispatch schedules.

  • Flake ice machines
  • Tube ice plants
  • Slurry / liquid ice
  • RSW chillers
  • Ice storage silos & distribution

Private by design.

You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.

Start private brief

Markets we source ice systems for

Sourcing runs the same way in every market: one structured specification, matched suppliers with real export experience for that destination, and anonymized bids priced on the same scope. Country pages below carry the local logistics, certification and installation detail.

Ice Systems: equipment guides and planning tools

Product-type guides explain what each item does, published specification ranges and what to put in a request. Size the project with the calculators, then send one reviewed RFQ.

Related categories

Short answer

How do you source Ice Systems for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Ice Systems, sources it from matched manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer