← All insightsCategory

Water Quality

8 articles filed under Water Quality.

Water Quality·8 min

Fish Dying at Dawn in a Pond? Low Oxygen Causes, First Actions and Aeration Checks

Why pond fish and shrimp die or gasp at dawn, what to do in the first hour, a cause-finding decision tree and a worked night oxygen budget with labeled assumptions.

Oct 2026
Water Quality·8 min

Dissolved Oxygen Sensors for Fish and Shrimp Farms: Optical vs Galvanic vs Polarographic

Compare optical, galvanic and polarographic dissolved oxygen sensors for ponds, tanks and RAS: pros and cons, limitations, placement, alarms and a buyer selection checklist.

Oct 2026
Water Quality·7 min

RAS Biofilter Sizing, Water Quality and Start-Up: Buyer Guide

A new RAS needs proven biological treatment capacity before full stocking—not just installed equipment. Use this buyer guide to specify commissioning, compare quotes and coordinate fish deliveries with biofilter readiness.

Oct 2026
Water Quality·7 min

Aquaculture Water Quality Testing Lab Equipment: A Commercial Sourcing Guide

Learn how to select the right handheld meters, photometers, and online probes for commercial fish and shrimp farms to ensure precise water quality management.

Oct 2026
Water Quality·7 min

UV and Ozone Disinfection Equipment for Aquaculture: Where Each Fits and How to Compare Quotes

UV suits clear, downstream flows like RAS loops and hatcheries; ozone suits intake and higher-organic-load water needing oxidation. Compare quotes on full scope, not price alone.

Oct 2026
Water Quality·8 min

Aquaculture Effluent and Sludge Management: Drum Filters, Settling, Dewatering and Wetlands Explained

How to specify drum filters, settling, sludge dewatering and constructed wetlands for aquaculture effluent, and how to compare supplier offers on equal terms.

Oct 2026
Water Quality·10 min

Water Quality Management in Commercial Aquaculture

Alkalinity, pH, TAN, nitrite, CO2 and salinity are not monitoring metrics — they are design constraints. A working guide to the water quality parameters that determine whether a commercial aquaculture project performs as planned.

Jul 2026
Water Quality·7 min

Aquaculture Filtration: Mechanical, Biological and Disinfection Explained

Define intake, recirculation and effluent treatment duties; compare flows, pollutant loads, operating conditions, energy, acceptance tests and scope boundaries.

Sep 2026

Aquaculture planning benchmarks

Indicative global planning ranges used in FishMatch Group calculators. Supplier quotes and site data confirm final values.
FigureValueContext
CAPEX — RASUSD 9,000–14,000 per tonne/yrGlobal baseline before country cost factor.
CAPEX — PondsUSD 1,800–4,000 per tonne/yrLined or earthen ponds, excluding land.
CAPEX — CagesUSD 2,500–5,500 per tonne/yrCages, moorings, nets and service equipment.
CAPEX — Flow-throughUSD 4,000–7,000 per tonne/yrRaceways and water intake works.
Energy useRAS ~6 kWh/kg; ponds ~1.2; flow-through ~1.5; cages ~0.3Per kg of fish produced.
Typical FCRTrout 1.1; salmon 1.2; shrimp 1.4; tilapia 1.6; carp 1.8kg feed per kg growth; varies with feed and management.
Farm size where FishMatch reviews projectsFrom ~USD 250,000 total project valueCommercial fish and shrimp projects.

FishMatch Group email updates

Get the buyer intelligence briefing

Practical aquaculture intelligence for sourcing and project decisions: new buyer guides, dated official-source updates and free tools, for the topics you choose.

What you will receive

  • A short digest of newly published FishMatch Group articles and center updates for your topics
  • A summary, publication date and link to the full article for every item
  • No advertising, supplier promotions or sales calls; subscribing never creates a sourcing request

We first email you a confirmation link. Your subscription starts only after you confirm.

Digest sending is still being set up. Confirmed subscribers receive the first digest when it starts; nothing else is sent.

Topics
How often

Read our Privacy Policy. Subscribing is separate from any procurement request.