Browse other categories
Planning (26)Equipment (14)Procurement (10)Sourcing (8)Water Quality (6)RAS (6)Markets (4)Financing (4)Operations (3)Costs (3)Shrimp (3)RAS Engineering (3)Buyer Playbook (3)Hatchery (2)Thought Leadership (2)Innovation (2)Biosecurity (2)Shrimp Farming (2)Logistics (2)Cold Chain (1)Tools (1)RAS Design (1)Consultants (1)Investor Guide (1)Sourcing Philosophy (1)Africa · Shrimp Vacuum (1)AI & Global Trade (1)AI & Aquaculture (1)Global Aquaculture (1)Aeration (1)Costing (1)Life Support (1)Energy & OPEX (1)Equipment Guide (1)Feed & Processing (1)
Aquaculture planning benchmarks
| Figure | Value | Context |
|---|---|---|
| CAPEX — RAS | USD 9,000–14,000 per tonne/yr | Global baseline before country cost factor. |
| CAPEX — Ponds | USD 1,800–4,000 per tonne/yr | Lined or earthen ponds, excluding land. |
| CAPEX — Cages | USD 2,500–5,500 per tonne/yr | Cages, moorings, nets and service equipment. |
| CAPEX — Flow-through | USD 4,000–7,000 per tonne/yr | Raceways and water intake works. |
| Energy use | RAS ~6 kWh/kg; ponds ~1.2; flow-through ~1.5; cages ~0.3 | Per kg of fish produced. |
| Typical FCR | Trout 1.1; salmon 1.2; shrimp 1.4; tilapia 1.6; carp 1.8 | kg feed per kg growth; varies with feed and management. |
| Farm size where FishMatch reviews projects | From ~USD 250,000 total project value | Commercial fish and shrimp projects. |