RAS Engineering·12 min
RAS Design Fundamentals: What to Lock Before You Buy Equipment
A practical framework for investors, EPCs and producers on the design decisions — species, production target, water strategy, mass balance and zoning — that must be locked before a single RAS component is procured.
Jul 2026
RAS Engineering·11 min
Sizing a RAS: From Feed Load to Oxygen Demand
A step-by-step walk-through of the mass balance that turns a target tonnage into oxygen demand, TAN load, CO2 production and biofilter sizing — the calculations lenders and EPCs expect to see before equipment is procured.
Jul 2026
Browse other categories
Sourcing (5)Financing (3)Shrimp Farming (3)Thought Leadership (2)Equipment (2)Biosecurity (2)Markets (2)Investor Guide (1)Sourcing Philosophy (1)Africa · Shrimp Vacuum (1)AI & Global Trade (1)AI & Aquaculture (1)Global Aquaculture (1)Aeration (1)RAS (1)Hatchery (1)Costing (1)Operations (1)Water Quality (1)Life Support (1)Energy & OPEX (1)Procurement (1)Equipment Guide (1)