FishMatch Group · Procurement guide

The 6-step aquaculture procurement sequence

The same sequence behind every FishMatch country sizing and cost page: size the system, localize for the market, benchmark CAPEX/OPEX, plan operators, stress-test bids — and only then submit a human-reviewed RFQ. Skipping a step is how projects end up comparing bids priced against different assumptions.

The sequence, step by step

  1. 1

    Size the system before any number

    Tank volume, recirculation flow, biofilter media and oxygen duty are what turn a per-tonne benchmark into a budget that survives a bid comparison. Run the RAS sizing calculator first — every downstream cost figure depends on these outputs.

    RAS sizing calculator
  2. 2

    Localize for country conditions

    Water rights, energy price, climate, permitting and local fabrication capability change the design before they change the price. A system sized for Norway is not the system sized for Vietnam — even at the same annual tonnage. Check the country-specific sizing and cost pages for the market you are building in.

    Country sizing & cost pages
  3. 3

    Benchmark CAPEX and OPEX

    Apply planning-grade per-tonne and per-kilogram bands to the sized system — as sanity checks, not quotations. CAPEX per tonne of annual capacity and OPEX per kilogram produced are the two numbers that expose an unrealistic bid fastest.

    RAS system cost breakdown
  4. 4

    Plan operator availability early

    Senior RAS process expertise — biofilter start-up, CO₂ and nitrate control — is scarce in most markets. Decide before tendering whether you will recruit, train or contract commissioning support, and carry that cost in the OPEX model rather than discovering it at start-up.

    Operator availability by country
  5. 5

    Stress-test and normalize bids

    Score instrumentation, redundancy, materials and after-sales support explicitly — these four items decide lifetime cost far more than headline CAPEX. Normalize every bid to the same scope before comparing prices, and pressure-test the water budget and cost per kilogram.

    How to compare RAS quotations
  6. 6

    Submit a human-reviewed RFQ

    Only after steps 1–5 does a brief go to FishMatch. A person reviews every brief before sourcing begins; suppliers are researched with technology support, validated for technical fit, and introduced only after approval by David or an authorized team member. Suppliers are never contacted automatically.

    Start a human-reviewed RFQ
Free tools

The calculators in this cluster are the working tools of the sequence — sizing, cost per kilogram, water budget and bid normalisation.

Procurement sequence — FAQ

FishMatch Group is a managed sourcing service. Every brief is reviewed by a person before sourcing begins — suppliers are never contacted automatically and supplier identities are never exposed.

Short answer

What is the fastest way to get quotes for Procurement Guide?

Submit one structured request for Procurement Guide. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer
Get Free QuotesFinancing