Hatchery Sourcing · Black Tiger Shrimp

Black Tiger Shrimp Hatchery Sourcing

Penaeus monodon

Specify Post-larvae PL12–PL20, wild & domesticated broodstock once — stage, health screening, packing and delivery date — and our team requests comparable offers from hatcheries for commercial projects. FishMatch does not sell or ship stock; supplier identities stay confidential until you approve an introduction.

  • First reply within one business day
  • Batch health documents requested
  • Landed-cost comparison
Product form
Post-larvae PL12–PL20, wild & domesticated broodstock
Genetics to specify (examples, not endorsements)
Moana Technologies · Domesticated SPF lines · Regional wild-caught
Larval cycle
25–30 days larval cycle
Health screening to ask for
WSSV, MBV, HPV, YHV
Key producing markets
India, Bangladesh, Vietnam, Indonesia, Madagascar
Companion feed (planning range)
Sinking pellet with attractants · FCR 1.5–1.9 · 38–42% CP

Black Tiger Shrimp stocking specifications

Stages supplied

PL12–PL20 for pond stocking, nauplii for hatchery operators, and domesticated or wild-origin broodstock where import rules allow.

Typical stocking density

Extensive and improved-extensive systems 2–10 PL/m², semi-intensive 10–20 PL/m², intensive lined ponds 25–40 PL/m². Monodon is stocked far lighter than vannamei because it grows larger and is more territorial.

Survival expectations

Extensive systems commonly run 50–70% survival, improved semi-intensive ponds 60–80%. The larger harvest size means a lower stocking count still reaches a competitive yield per hectare.

Unverified reference range from general practice, not a guarantee or design value. Use your own records or your adviser's assumption.

Quality checks on arrival

Even size grading, strong tail-flip response, clean rostrum and appendages, and a salinity stress test before release.

Shrimp farm calculator

Shipping, packing & lead times

Lead time

Monodon larval cycles run longer than vannamei, so book three to five weeks ahead — especially for domesticated SPF lines with limited capacity.

Packing

Oxygenated bags at lower density than vannamei because of the larger PL size, in insulated boxes with a stated count per bag.

Transit window

Air freight within 24–36 hours at 26–29°C; density drops further on transits beyond a day.

Minimum scale

Cross-border shipments typically start in the several-hundred-thousand PL range; regional sourcing suits smaller stocking plans.

Health documentation to ask for

  • Batch qPCR screening for WSSV, MBV, HPV and YHV
  • Broodstock origin declaration stating domesticated SPF line or legally documented wild origin
  • Government health certificate and destination import permit
  • Packing list with PL stage, count method and bag density
  • CITES or wild-capture documentation where the destination requires it
Importing seed stock? Health certificates, WOAH-listed diseases and permits

What drives the price

Broodstock source

Domesticated SPF lines cost more than wild-origin stock but carry far less disease and consistency risk.

PL stage

PL20 costs more per animal than PL12 and normally justifies it through better handling survival.

Hatchery capacity

Fewer hatcheries run monodon than vannamei, so available capacity moves price more than volume discounts do.

Season

Broodstock availability is seasonal in several producing regions, which tightens supply at predictable points in the year.

Freight

Lower bag density means more boxes per million PL and a higher freight share of landed cost.

Indicative guidance only, not prices. Compare offers only once stage, count method, packing and freight terms match.

Black Tiger Shrimp sourcing questions

Monodon grows to a much larger harvest size and is more territorial, so ponds are stocked at a fraction of vannamei densities and still reach a competitive yield per hectare.

Domesticated SPF lines cost more but bring documented health status and more consistent performance. Wild-origin stock is cheaper and sometimes grows faster, but carries disease and traceability risk that many buyers and lenders will not accept.

Roughly 25–30 days from nauplii to PL, longer than vannamei, which is why orders should be booked three to five weeks ahead.

India, Vietnam, Indonesia, Bangladesh and Madagascar are the main production bases. The right origin depends on your import rules, freight route and the stage you need.

Batch-level qPCR for WSSV, MBV, HPV and YHV, plus the government health certificate and import permit for your destination.

We make sure quotes state the documentation each hatchery will provide, so you can check it against your destination's import requirements before committing.
Sourcing origins & planning

Request Black Tiger Shrimp hatchery quotes

Volume, stage, delivery window and health documents — a person reviews every request and replies within one business day. Hatchery quote timing is never promised.

FishMatch Group and the other Global B2B Group platforms are committed to conducting their own activities in accordance with applicable laws and regulations. FishMatch facilitates sourcing and RFQs; it does not manufacture, process, export or sell the listed products and does not grant regulatory approval. Requirements differ by product and by origin, destination and transit country. As buyer or importer, you remain responsible for your own import permissions, local requirements and due diligence. This notice does not change anyone's legal duties and is not legal advice. Regulation & responsibilities
Step 1 of 6Equipment

Confidential matching · Supplier-paid model · No obligation · Human-assisted sourcing

Privacy: We use these details to review and answer this request. They stay confidential, are shared only as described in our Privacy Policy, and are not used for marketing unless you separately opt in. We keep them while your request or account is active and for as long as legal record-keeping requires. Privacy Policy · Your rights

Other hatchery species

Explore aquaculture and RAS suppliers here for research and market discovery, or start with your project requirements so FishMatch can help structure the RFQ and identify relevant system providers for that specific production plan.

Directory — research

Browse categories, countries and technology types to understand the market and which system types exist. Nothing is requested and no supplier is contacted.

Project sourcing — RFQ

Define species, system, production target and site conditions, size the requirement with the planning tools, and build one structured RFQ. Manufacturer research follows the requirement.

  • FishMatch helps prepare aquaculture RFQs and source relevant suppliers.
  • Supplier and manufacturer listings are provided for independent research, transparency and reference. Listing does not constitute certification, endorsement, qualification for a specific project or automatic introduction.
  • Buyer follow-up and supplier selection are handled by FishMatch.

There is no instant or automated supplier match. Manufacturer research happens after the project requirement is clear and is reviewed by the FishMatch team before any supplier is approached.

Manufacturers can register in the free directory and keep their company details up to date. Being listed is a research and visibility surface — it does not create an automatic connection to buyers, and it does not replace the human sourcing process.

Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.

Is FishMatch right for your project?

When is FishMatch a good fit for a buyer?

FishMatch can be a fit when a buyer needs structured RFQ intake, aquaculture-specific calculators, project-specific technical information and a clearer procurement path for hatchery, nursery and broodstock systems. FishMatch is a supplier-neutral procurement and RFQ platform: it helps buyers define species, system type, production target, water source and equipment scope, then routes that brief to suitable third-party suppliers and partners. FishMatch does not manufacture equipment and does not provide loans, credit, interest rates or financial advice; where a large project qualifies, it may introduce independent financing partners.

Best for

  • ·Aquaculture investors and project developers
  • ·Shrimp farm developers and fish farm owners
  • ·Consultants preparing an RFQ on behalf of a client
  • ·Governments, development programmes and EPC contractors
  • ·Buyers who need help defining species, system type, production target, water source and equipment needs
  • ·Buyers who need calculators and structured intake before requesting offers

Not ideal for

  • ·Aquarium, hobby or ornamental fish equipment
  • ·Small retail purchases and single spare parts
  • ·Buyers who want instant fixed pricing without project details
  • ·Requests outside aquaculture and related systems
  • ·Buyers expecting guaranteed financing, credit approval or interest rates
  • ·Buyers who cannot provide basic species, system, location or capacity details
Commercial project route

Is your project a fit?

FishMatch Group handles commercial B2B projects with a total budget of USD 250,000 or more — new farms, hatcheries, RAS, cages, processing or expansions. The buyer sends one brief; our team reviews and structures the RFQ, then approaches suitable suppliers on the buyer's behalf. Buyers are not put in direct contact with manufacturers at this stage. Smaller or idea-stage projects can start with the calculators below and send the RFQ once scope and budget are clearer.

Which inputs change the estimate and the RFQ?

Calculator results and supplier quotes both depend on: species and life stage, production target (tonnes per year or PL per cycle), water source and quality (temperature, salinity, flow), system design (pond, cage, RAS, hatchery, processing), site and access, energy supply and price, permits, and timeline.

Calculator figures are planning estimates based on stated assumptions — not engineering designs or supplier quotes. Growth, survival and output depend on project-specific biology and operating conditions and are never guaranteed. Formulas, assumptions and sources: calculator methodology.

2. Equipment & project sourcing

Send a structured RFQ. A person checks scope and budget before any supplier is approached.

Start the project RFQ

3. Financing (separate)

Financing is a separate track. FishMatch Group does not lend or guarantee financing.

Aquaculture financing

Short answer

What is the fastest way to get quotes for Monodon Shrimp?

Submit one structured request for Monodon Shrimp. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.