Black Tiger Shrimp
Black tiger shrimp reach large sizes (30–60 g) and command premium prices in Japan, EU and North America. Farmed mostly in extensive to semi-intensive ponds across South and Southeast Asia. Slower growth and higher disease sensitivity than vannamei.
Which system fits Black Tiger Shrimp?
Traditional low-to-medium density ponds.
Emerging intensive systems, mostly in India.
Rare; premium indoor pilots exist.
SPF/SPR broodstock capacity is limited globally.
Nursery use.
Not commercial.
Plan by production capacity
Scope, layout & utilities
- Typical scale: 1–100 ha of ponds; densities 5–25 PL/m² (semi-intensive).
- Requires quality broodstock — a limiting factor for expansion.
- Water quality tighter than vannamei (DO, salinity, temperature).
- Longer cycle (150–180 days) demands stable operating capital.
- Larger harvest size drives premium pricing; grading is critical.
Recommended equipment categories
Categories only — no manufacturer recommendations
Head-to-head trade-offs
| Metric | RAS | Earthen / Lined Pond |
|---|---|---|
| CAPEX per kg/yr | High | Low – Medium |
| Water use | Very low (95%+ recycled) | High (exchange or evaporation) |
| Land footprint | Small, indoor | Large, outdoor |
| Biosecurity | Excellent (closed loop) | Weather / disease exposure |
| Year-round production | Yes, climate independent | Seasonal in many climates |
| Skill requirement | High — engineering + biology | Medium — biology-led |
| Best fit | High-value markets, land-constrained sites | Low-cost regions, large-scale commodity output |
| Metric | Black Tiger (P. monodon) | Whiteleg (L. vannamei) |
|---|---|---|
| Harvest size | 30–60 g | 15–25 g |
| Cycle length | 150–180 days | 90–120 days |
| Density | Low – medium | Medium – very high |
| Market price | Premium | Commodity |
| Disease resistance | Lower (WSSV) | Higher (SPF lines) |
| Best fit | Extensive ponds, premium markets | Intensive systems, commodity export |
Major CAPEX & OPEX drivers
- Pond construction
- Aeration
- Hatchery / PL supply chain
- Feed
- PL / broodstock
- Energy
- Labor
Constrained by broodstock supply and cycle length; plan capacity in 12–18 month waves.
Lower aeration than vannamei intensive, but consistent DO monitoring still required.
Checklist before requesting quotations
- PL / broodstock source and health certification.
- Pond size and stocking density plan.
- Aeration and emergency backup power.
- Cold chain sized for larger, higher-value shrimp.
- Grading equipment for size premium markets.
Continue your project
Build an RFQ tuned for Black Tiger Shrimp
Suggested equipment categories: Aeration · Hatchery / broodstock systems · Cold chain · Feeders
FAQ — Black Tiger Shrimp
Short answer
What is the fastest way to get quotes for Black Tiger Shrimp?
Submit one structured request for Black Tiger Shrimp. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer