Importing Shrimp Post-Larvae, Fish Fingerlings and Eggs: Health Certificates, Listed Diseases and Permits
Updated 22 October 2026 · Sources checked 22 October 2026 · FishMatch Group Intelligence · Independent, supplier-neutral buyer guidance
Also available in:EspañolPortuguêsFrançaisРусский

Quick answer
Before you order post-larvae, fingerlings, eyed eggs or broodstock from another country, three things must match: the importing country's permit and import conditions; an official health certificate from the exporting country's competent authority that states exactly what those conditions require; and evidence behind every health claim, such as SPF status, that names the pathogens and the tests used. WOAH standards provide the shared framework — listed diseases and model certificates — but the importing country's competent authority decides the actual requirements. Confirm them in writing for each species, life stage and origin before you pay a deposit.
Key points
- The importing country's competent authority sets the import conditions. WOAH standards are the reference framework, not a permit.
- "SPF" means freedom from a named list of pathogens under a defined surveillance and biosecurity programme. It does not mean disease resistance or freedom from every pathogen.
- EHP (Enterocytozoon hepatopenaei) is not on the WOAH list of diseases (Aquatic Code Chapter 1.3, 2024 update). It will only appear on a certificate or test plan if the import conditions or your contract require it.
- Agree the certificate wording, the testing laboratory and the sampling plan in the purchase contract, before the stock is packed.
- Legal health certification and biological quality (size, uniformity, stress tests, survival) are separate checks. You need both.
Who decides what a live-seed import needs
Cross-border movements of live aquatic animals are controlled by the importing country. Its competent authority — usually the veterinary or aquatic animal health service — decides whether a species and life stage may enter, from which countries, zones or establishments, what testing and certification are required, and whether the animals must spend time in quarantine after arrival. The exporting country's competent authority then certifies that the consignment meets those conditions.
The World Organisation for Animal Health (WOAH) publishes the Aquatic Animal Health Code. It sets international standards that members use when they write import conditions, including the list of notifiable aquatic animal diseases (Chapter 1.3) and model health certificates for trade in live aquatic animals (Chapter 5.11). The Code is a framework, not a permit: two importing countries can set different conditions for the same species.
Requirements can also differ by life stage. Broodstock, post-larvae and eyed eggs of the same species may be treated differently, and the disease status of the source zone or compartment matters. Treat a supplier's statement that "no permit is needed" as a question to put to the importing authority, not as an answer.
WOAH-listed diseases buyers most often meet
The list below is taken from Chapter 1.3 of the Aquatic Code as updated in 2024. For crustaceans the list is complete. For fish it shows examples relevant to common farmed species; the full fish list is longer. Import conditions often refer to these diseases, but they may add others or leave some out.
| Animal group | Listed diseases (Chapter 1.3, 2024 update) | What this means for a buyer |
|---|---|---|
| Crustaceans (complete list) | Acute hepatopancreatic necrosis disease (AHPND); white spot syndrome virus (WSSV); infectious hypodermal and haematopoietic necrosis virus (IHHNV); Taura syndrome virus; yellow head virus genotype 1; infectious myonecrosis virus; Hepatobacter penaei (necrotising hepatopancreatitis); decapod iridescent virus 1; Macrobrachium rosenbergii nodavirus; Aphanomyces astaci (crayfish plague) | Ask which of these the import conditions require the certificate to cover for your species, and how they will be tested. |
| Fish (selected examples) | Tilapia lake virus; koi herpesvirus; viral haemorrhagic septicaemia virus; infectious salmon anaemia virus (HPR-deleted or HPR0) | Relevant to tilapia, carp, trout and salmon seed. Check the full chapter for your species. |
| Not listed | EHP (Enterocytozoon hepatopenaei) is not on the list | If EHP matters for your farm, put the test in the contract. Listing status alone will not put it on the certificate. |
SPF, SPR and "high-health": what each claim should prove
Specific pathogen free (SPF) describes the health status of a stock with respect to a defined list of pathogens, maintained under a surveillance and biosecurity programme. It does not mean the animals are free of every pathogen, and it does not mean they are resistant. Specific pathogen resistant (SPR) describes resistance or tolerance to a specified pathogen; a stock can carry both labels. This distinction is set out in the review "Facts, truths and myths about SPF shrimp in aquaculture" (Alday-Sanz et al., Reviews in Aquaculture, 2018).
Because SPF describes a stock under a programme, the label does not automatically carry over when animals leave that programme — for example, post-larvae produced in a different hatchery from SPF broodstock. Ask which programme covered the exact batch you are buying, and what happened between the broodstock facility and the shipping tank.
"High-health" and similar marketing terms have no single defined meaning. Treat them as an invitation to ask the same questions you would ask for SPF.
- The written list of pathogens the stock is claimed to be free of.
- The surveillance programme behind the claim: who runs it, how often stock is tested, and how long the history goes back.
- Recent test results for the batch offered, with laboratory name, method, sampling date and number of animals sampled.
- Whether the official health certificate covers the same pathogens. Often it covers fewer, and the difference has to be covered contractually.
Testing evidence: what a credible result looks like
The WOAH Manual of Diagnostic Tests for Aquatic Animals describes the recommended diagnostic methods, including PCR-based methods for many listed diseases; the Manual was last amended at the May 2025 General Session. A test report gives evidence about the animals sampled, at the time they were sampled. A negative result on a small sample is not proof that the whole population is free of the pathogen. Sample size, timing and who took the samples all affect how much the result tells you.
- Laboratory identity, and whether it is accredited for the specific test (for example to ISO/IEC 17025) or officially designated by the competent authority.
- The method used and the reference it follows.
- Sampling date compared with the shipping date, and the tank or batch IDs that link the samples to the consignment.
- Who collected the samples: an official inspector, an independent party or the supplier.
- Number of animals sampled and how they were pooled.
Documents to line up before shipment
Most failed live-seed imports come down to paperwork that did not match the import conditions, or that arrived after the animals did. Build the document set from the import conditions backwards and agree each item with the supplier before the order is confirmed.
| Document | Issued by | When | Buyer check |
|---|---|---|---|
| Import permit or written import conditions | Importing country's competent authority | Before you confirm the order | Species (scientific name), life stage, origin, quantity, validity dates, entry point |
| Official health certificate | Exporting country's competent authority | At or just before dispatch | The wording matches the import conditions; pathogens, zone or establishment status and identification details are correct |
| Laboratory test reports | Laboratory named in the contract | Within the window the import conditions or contract set | Batch IDs, method, sample size and dates match the consignment |
| CITES permit, if the species is listed | CITES Management Authorities of both countries | Before export | Needed for listed species — for example, sturgeons. Check the CITES Appendices. |
| Commercial invoice and packing list | Supplier | At dispatch | Counts, how counts were made, species, life stage, box numbers |
| Carrier acceptance and live-animal requirements | Airline or forwarder | Booked before dispatch | Packing, labelling and routing meet the carrier's live-animal rules (for air freight, IATA Live Animals Regulations) |
Contract terms that protect the buyer
Live seed is perishable and is only partly replaceable within a production cycle, so the contract should settle what happens if a document, a test or the shipment fails. The terms below are common points to negotiate. They are not a model contract: have your lawyer adapt them to the governing law and the supplier's terms.
- The order is conditional on the import permit being issued and on the health certificate being issued in the agreed wording, attached as an annex.
- Pre-shipment sampling and testing by a named laboratory, with the buyer's right to nominate or witness sampling.
- How quantity is counted at packing and how it is verified on arrival, including how dead animals are treated.
- Mortality on arrival: how it is defined, the evidence required (counts, photos, temperature and oxygen records), the claim deadline, and whether the remedy is replacement or refund.
- Who pays for quarantine, re-testing, and the destruction or return of a consignment that fails import checks.
- Packing specifications (density, water, oxygen, temperature) agreed in writing, plus who decides when a flight disruption should cancel the shipment.
- Risk and title are dealt with explicitly. Incoterms allocate delivery costs and risk, but not ownership or payment terms.
Arrival, quarantine and traceability
Plan the receiving side before dispatch. If the import conditions require quarantine, the facility must be ready, approved where approval is required, and separated from the main farm's water, staff and equipment. Agree the acclimation procedure with the supplier, record water quality, counts and mortalities for each batch, and keep the certificate, test reports and arrival records together under one batch identifier. Those records support any claim against the supplier and any later disease investigation.
Pre-order checklist for live seed imports
- Import conditions obtained in writing from the importing country's competent authority for this species, life stage and origin
- Certificate wording agreed with the supplier and checked against the import conditions
- Pathogen list for SPF or other health claims received in writing, with programme history
- Recent batch-level test reports reviewed: laboratory, method, sample size, dates
- Additional contractual tests agreed for diseases not covered by the certificate (for example, EHP for shrimp)
- CITES status checked for the species
- Carrier and routing confirmed for live animals, including a contingency plan for delays
- Quarantine or receiving facility prepared and, where required, approved
- Counting method, mortality-on-arrival definition and claim process written into the contract
- Responsibility for failed checks, re-testing and destruction costs agreed
- Biological quality checks agreed separately (size, uniformity, stress test, survival evidence)
- One batch ID used across invoice, certificate, test reports and arrival records
Buyer questions
Do I need an import permit for shrimp post-larvae?
In most countries, yes, but the importing country's competent authority decides. It sets whether a permit is needed, which origins are accepted, the testing and certificate wording, and any quarantine. Ask the authority directly, in writing, for your species, life stage and origin.
Is SPF shrimp the same as disease-resistant shrimp?
No. SPF means the stock is free of a named list of pathogens under a surveillance and biosecurity programme. Resistance is described by SPR. A stock can be SPF, SPR, both or neither, so ask for the pathogen list and the programme behind the claim.
Does the WOAH list tell me what my health certificate must cover?
Not by itself. The WOAH list and model certificates are the international reference, but the certificate must state what the importing country's conditions require. Those conditions can add diseases, leave some out, or set requirements for the source zone or establishment.
Is EHP a WOAH-listed disease?
No. EHP (Enterocytozoon hepatopenaei) does not appear in Chapter 1.3 of the Aquatic Code as updated in 2024. If it matters for your farm, specify an EHP test, laboratory and sampling plan in the purchase contract.
Can FishMatch Group source seed stock and handle the permit?
Permits are issued by the authorities, normally to the importer. For commercial projects — generally USD 250,000 and above — FishMatch Group runs supplier-neutral, human-reviewed sourcing and can help you prepare a technical brief with the health and document requirements. We do not guarantee approvals, survival or performance.
Related tools and guides
Sources and dates
- Aquatic Animal Health Code, Chapter 1.3 — Diseases listed by WOAHWorld Organisation for Animal Health (WOAH) · Most recent update adopted 2024 (PDF dated 2 July 2024)
- Aquatic Animal Health Code 2025 — table of contents (Chapter 5.11, model health certificates)WOAH · 2025 edition
- WOAH Standards — updated per resolutions adopted at the 2025 General SessionWOAH · Published 22 September 2025
- Amendments to the Manual of Diagnostic Tests for Aquatic Animals (Resolution No. 24)WOAH · Adopted 29 May 2025
- Aquatic Manual chapter: Infection with yellow head virus genotype 1 (RT-PCR methods)WOAH · Chapter revision date not stated on the file
- Facts, truths and myths about SPF shrimp in aquaculture (Alday-Sanz et al., Reviews in Aquaculture)Wiley; copy hosted by FAO · 2018
- CITES Appendices I, II and IIICITES Secretariat · Check the current appendices on the day you order
Rules and disease listings change. This guide summarises the sources above as checked on 22 October 2026. It is general buyer information, not legal or veterinary advice. Before ordering, confirm the requirements with the importing country's competent authority and your own advisers.