← FishMatch Group
service

Cold Chain & Logistics

IQF tunnels, blast freezers, reefer logistics and export-grade packaging.

Network

Project-matched cold-chain & logistics partners

Process

Private & anonymized

Buyer fees

Zero

What we source

Source cold-chain equipment and logistics for seafood: IQF tunnels, blast freezers, cold rooms, refrigerated trucks, reefer containers, and export-grade packaging.

  • IQF & blast freezers
  • Cold rooms & cold storage
  • Reefer trucks & containers
  • Export packaging
  • Traceability systems

Private by design.

You'll never see supplier names. We run a sealed-bid process and present anonymized proposals — you choose the winner, we handle the introduction and the contract.

Start private brief

Markets we source cold chain & logistics for

Sourcing runs the same way in every market: one structured specification, matched suppliers with real export experience for that destination, and anonymized bids priced on the same scope. Country pages below carry the local logistics, certification and installation detail.

Related categories

Short answer

How do you source Cold Chain for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Cold Chain, sources it from vetted manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

What we compare:
Scope, capacity, energy use, lead time and total cost of ownership
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Delivery terms:
Quotations normalised to EXW / FOB / CIF so prices are like-for-like
Cost to buyers:
No fee charged to the buyer
How do you source Cold Chain for a commercial aquaculture project?

Start from the process requirement — biomass, flow, water quality target and site constraints — not from a product catalogue. FishMatch Group converts that requirement into a specification for Cold Chain, sources it from vetted manufacturers and integrators across Europe, Asia and the Americas, and returns like-for-like quotations with lead times, energy consumption and lifetime running cost stated in the same format.

How does FishMatch Group source suppliers for this requirement?

You submit one structured request. We translate it into a technical RFQ, run it against qualified manufacturers and integrators in the relevant categories, and return normalised quotations you can compare side by side on scope, lead time and total cost of ownership.

Do buyers see supplier names during the sourcing process?

No. Supplier identities stay confidential during discovery and evaluation. You receive anonymised, comparable technical and commercial packages, and introductions happen only after both sides are qualified and agree to proceed.

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

Get Free QuotesFinancing