Procurement Knowledge · English

Aquaculture Technical Specification Guide

Vague specs guarantee non-comparable quotes. This guide translates common buyer requirements into measurable engineering specifications that project-matched manufacturers can price precisely.

Water quality targets

State target ranges, not preferences. Example: DO ≥ 6 mg/L, TAN ≤ 0.5 mg/L, NO₂-N ≤ 0.1 mg/L, CO₂ ≤ 15 mg/L, TSS ≤ 15 mg/L, alkalinity 150–200 mg/L as CaCO₃.

Biomass and loading

Design biomass in kg/m³ at harvest, feed rate as % body weight/day, protein content, expected FCR. These drive filtration, oxygenation and cooling sizing.

Redundancy and uptime

N+1 on critical pumps and blowers, dual-power feeds, UPS backup for controls, mortality alarm SLA in minutes.

Materials and hygiene

Tank material (HDPE / GRP / concrete-lined), food-grade certification, biosecurity zoning, footbath and disinfection interlocks.

Controls and data

SCADA scope, sensor list, communications protocol (Modbus / OPC-UA / MQTT), data retention, remote access, alarm escalation matrix.

FAQ

Use the calculators to estimate flows, oxygen demand and cooling load, then feed the numbers into your RFQ.

Only when spare-parts commonality with existing farms matters. Otherwise leave the door open — you'll get better pricing.
More procurement guides
Other languages

Short answer

What is the fastest way to get quotes for Technical Specification Guide?

Submit one structured request for Technical Specification Guide. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.

How it works:
One structured request, human-reviewed before any supplier outreach
Typical turnaround:
Depends on scope and site data; no turnaround is guaranteed
Confidentiality:
Supplier names are never exposed during evaluation
Cost to buyers:
No fee charged to the buyer