Pillar · Biosecurity

Biosecurity & Disease Prevention

Biosecurity is the systemic prevention of pathogen introduction, spread and impact in an aquaculture facility — the single highest-ROI CAPEX after core life-support. A well-designed biosecurity program costs 3–7% of total CAPEX and prevents losses that routinely reach 100% of a stocked cohort.

Threat map by species and system

Shrimp: WSSV, EMS/AHPND, IHHNV, EHP. Salmon: ISA, PD, SRS, sea lice. Tilapia: TiLV, streptococcus. Marine fin-fish: viral nervous necrosis, amoebic gill disease. Design your biosecurity around the specific threat profile of your species and geography.

The five biosecurity control layers

Zoning; incoming-water treatment (UV / ozone / filtration); animal-input QA (SPF certification, PCR screening, quarantine); staff/vehicle/equipment decontamination; outbreak response plan with pre-authorised destruction and disinfection protocols.

Incoming-water disinfection

Every water source is a pathogen vector. UV, ozone, chlorine + dechlorination, filtration and settlement each have specific pathogen-kill profiles. Design the water treatment train around the highest-risk pathogen for your species.

Quarantine and stress-testing incoming animals

Every incoming batch — broodstock, PL, fingerlings, live feed — passes quarantine with PCR screening, a stress-test cohort and documented incubation before entering the main system.

Response plan: assume outbreaks happen

Every commercial facility needs a written outbreak response plan: isolation, sampling, laboratory confirmation, regulatory notification, staged destruction, disinfection and re-stocking protocols. Rehearse it annually.

Related resources

FAQ

3–7% of total CAPEX for a well-designed biosecurity envelope on greenfield facilities. Under-investment here is the biggest false economy in commercial aquaculture.

Specific Pathogen Free — animals tested and confirmed negative for a defined list of pathogens. For shrimp vannamei: yes, non-negotiable. For salmon: rapidly becoming standard. For emerging species: match your buyer's requirements.

Document zones, control layers and decontamination protocols. Score against ASC/BAP hatchery and farm modules. Third-party audit annually. Rehearse the outbreak response plan every 12 months.

Yes, for licensed vaccines. Vaccinated stocks reduce mortality and antibiotic use, but vaccination does not replace zoning, water treatment or QA — it complements them.

Every aquaculture insurance policy prices biosecurity design and documentation. A documented, audited program can reduce premium 15–30% and expand available cover.
Buyer-first · Supplier-neutral

One RFQ. Multiple project-matched suppliers. Zero cost to buyers.

Short answer

What do buyers need to know about Biosecurity Disease Prevention?

Biosecurity Disease Prevention affects both project cost and project risk, so it belongs in the specification stage rather than the purchasing stage. This page sets out what commercial buyers assess, what typically drives cost and lead time, and which questions to put to suppliers before signing. You can turn any of it into a confidential RFQ in a few minutes.

Who it is for:
Investors, operators and project developers specifying commercial systems
Cost drivers:
Capacity, water source, energy price, permitting and logistics
Next step:
Turn the requirement into a confidential RFQ
Cost to buyers:
No fee charged to the buyer