RAS Shrimp Farming: The Complete Guide

Shrimp RAS is no longer experimental. Producers in Europe, the Middle East and increasingly Vietnam use RAS to control disease, water use and stocking density.
Core RAS subsystems
Drum filter for solids, MBBR or fixed-bed biofilter for ammonia, protein skimmer, oxygen cone, ozone or UV polishing, denitrification reactor for nitrate, and SCADA for control.
Stocking density
Super-intensive RAS shrimp regularly stocks at 300–500 PL/m² producing 4–8 kg/m²/cycle.
Energy
Energy is a major OPEX line. Heat recovery and variable-speed drives matter.
Financing options
ECA-backed export finance and equipment leasing can be evaluated by independent third-party providers.
Related: shrimp RAS Vietnam · commercial shrimp equipment · submit a request.
Aquaculture planning benchmarks
| Figure | Value | Context |
|---|---|---|
| CAPEX — RAS | USD 9,000–14,000 per tonne/yr | Global baseline before country cost factor. |
| CAPEX — Ponds | USD 1,800–4,000 per tonne/yr | Lined or earthen ponds, excluding land. |
| CAPEX — Cages | USD 2,500–5,500 per tonne/yr | Cages, moorings, nets and service equipment. |
| CAPEX — Flow-through | USD 4,000–7,000 per tonne/yr | Raceways and water intake works. |
| Energy use | RAS ~6 kWh/kg; ponds ~1.2; flow-through ~1.5; cages ~0.3 | Per kg of fish produced. |
| Typical FCR | Trout 1.1; salmon 1.2; shrimp 1.4; tilapia 1.6; carp 1.8 | kg feed per kg growth; varies with feed and management. |
| Farm size where FishMatch reviews projects | From ~USD 250,000 total project value | Commercial fish and shrimp projects. |
Related articles
Where this fits in a real project
Every FishMatch project runs through the same five reviewed stages, from a first enquiry to comparable quotations. See the full buyer journey.
Planning a commercial aquaculture project?
Send your project brief. A FishMatch specialist reviews it before relevant suppliers are contacted privately.
Request a quote