Logistics· Oct 2026·8 min read

Incoterms for Aquaculture Equipment: EXW, FOB, CIF, DAP and DDP Explained

Also in:中文

Crated fish tank being lifted onto a ship at the quay
Free RAS feasibility calculatorCheck CAPEX, payback and return for your project before you request quotes.Open the calculator

Two RAS quotes can look far apart simply because they use different shipping terms. Incoterms are the international rules that define where the supplier's responsibility ends and yours begins — for cost, for risk and for paperwork. Comparing quotes without aligning them is comparing different products.

EXW — Ex Works

The supplier makes the goods available at their factory. You arrange and pay for loading, export clearance, freight, insurance, import clearance and inland delivery. The lowest headline price, but the most work and risk for the buyer.

FOB — Free On Board

The supplier delivers the goods loaded on the vessel at the named port of departure and handles export clearance. From that point, freight, insurance and risk are yours. Common for buyers with their own freight forwarder.

CFR and CIF — Cost and Freight / Cost, Insurance and Freight

The supplier pays sea freight to your destination port; under CIF they also buy minimum insurance. Note that risk still passes to you when the goods are loaded at origin, even though the supplier paid the freight. Check whether minimum cover is enough for high-value equipment.

DAP — Delivered At Place

The supplier delivers to a named place, often your site, ready for unloading. You handle import clearance, duties and taxes. Useful when you want one party responsible for the whole journey but prefer to manage customs locally.

DDP — Delivered Duty Paid

The supplier delivers to your site with duties and import taxes paid. The simplest for the buyer and the highest quoted price. Not every supplier can offer it in every country.

Which one to ask for

For comparison, ask all suppliers to quote on the same term — often FOB plus a separate CIF or DAP price to your port or site. Then add the costs you carry yourself on top, so each proposal is compared as a delivered, landed cost. The RAS equipment prices and landed cost article shows how.

Physical logistics — containers, packing and inspection — are covered in shipping RAS equipment internationally.

FishMatch Group reviews every brief manually before sourcing begins; suppliers are never contacted automatically and supplier identities are never exposed. Start with a human-reviewed RFQ.

Aquaculture planning benchmarks

Indicative global planning ranges used in FishMatch Group calculators. Supplier quotes and site data confirm final values.
FigureValueContext
CAPEX — RASUSD 9,000–14,000 per tonne/yrGlobal baseline before country cost factor.
CAPEX — PondsUSD 1,800–4,000 per tonne/yrLined or earthen ponds, excluding land.
CAPEX — CagesUSD 2,500–5,500 per tonne/yrCages, moorings, nets and service equipment.
CAPEX — Flow-throughUSD 4,000–7,000 per tonne/yrRaceways and water intake works.
Energy useRAS ~6 kWh/kg; ponds ~1.2; flow-through ~1.5; cages ~0.3Per kg of fish produced.
Typical FCRTrout 1.1; salmon 1.2; shrimp 1.4; tilapia 1.6; carp 1.8kg feed per kg growth; varies with feed and management.
Farm size where FishMatch reviews projectsFrom ~USD 250,000 total project valueCommercial fish and shrimp projects.

Related articles

Where this fits in a real project

Every FishMatch project runs through the same five reviewed stages, from a first enquiry to comparable quotations. See the full buyer journey.

Planning a commercial aquaculture project?

Send your project brief. A FishMatch specialist reviews it before relevant suppliers are contacted privately.

Request a quote

Before you request quotes

Equipment scope

What equipment does a commercial aquaculture project actually need?

A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.

Which equipment should be specified before requesting quotes?

Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.

Can equipment be sourced in stages?

Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.

FishMatch Group email updates

Get the buyer intelligence briefing

Practical aquaculture intelligence for sourcing and project decisions: new buyer guides, dated official-source updates and free tools, for the topics you choose.

What you will receive

  • A short digest of newly published FishMatch Group articles and center updates for your topics
  • A summary, publication date and link to the full article for every item
  • No advertising, supplier promotions or sales calls; subscribing never creates a sourcing request

We first email you a confirmation link. Your subscription starts only after you confirm.

Digest sending is still being set up. Confirmed subscribers receive the first digest when it starts; nothing else is sent.

Topics
How often

Read our Privacy Policy. Subscribing is separate from any procurement request.