Won a new supply contract? Can your farm actually deliver the extra volume?
Short answer
We won a new customer or supply contract
Start from the contracted tonnage and delivery calendar, not from an equipment list. Convert the additional volume into standing biomass, feed tonnage, oxygen demand, water exchange, juvenile requirement and harvest rate at the peak week — not the annual average. Compare each of those figures with the installed capacity you have today. The systems with no headroom are the project; everything else stays as it is. Only then does it make sense to price equipment and issue an RFQ, because contract penalties make an under-sized system far more expensive than the equipment saved.
- Plan against:
- Peak week, not annual average
- Typical first limits:
- Oxygen, power, juvenile supply
- Usual lead-time risk:
- Long-lead electrical & oxygen equipment
- Project scale:
- Frequently USD 250k+
What this usually looks like on the farm
- A tonnage and delivery schedule are already contractually fixed
- The commercial team committed before an engineering capacity review
- Current production is close to the ceiling of the existing infrastructure
- Delivery dates are shorter than typical equipment lead times
- Penalties or exclusivity clauses make a shortfall expensive
How to diagnose it, in order
- 1Convert the contract into biomass
Translate contracted tonnage and delivery dates into standing biomass by month, including the peak week that everything must be sized for.
- 2Recalculate feed demand
Additional biomass means additional feed tonnage, storage volume, delivery frequency and feeding capacity per day.
- 3Recalculate oxygen demand
Oxygen demand rises with biomass, feeding rate and temperature. Verify installed aeration and emergency oxygen against the worst-case night at peak biomass.
- 4Check water and pumping
Exchange rate, intake capacity, pumping head and treatment duty all scale with the new load and with the organic load from extra feed.
- 5Check electrical capacity
Grid headroom, transformer capacity, distribution and standby generation are frequently the hard limit on a production increase.
- 6Check juvenile supply
More grow-out means more post-larvae or fingerlings on a reliable calendar — hatchery or nursery capacity often becomes the true bottleneck.
- 7Check harvest and cold chain
Harvest rate, ice, chilling and cold storage must absorb the larger batches within the same quality window.
- 8Price the gap and issue an RFQ
Turn only the constrained systems into a scoped, comparable RFQ with the same assumptions given to every supplier.
The bottleneck moves — plan it as one system
Solving one constraint normally shifts the limit downstream. On this trigger the chain typically runs:
- More contracted tonnage
- Higher standing biomass
- More feed per day
- Higher oxygen demand
- More aeration and oxygenation power
- More electrical load and backup power
- More pumping and water treatment
- Larger harvest batches
- More ice, chilling and cold storage
Investment drivers
- Aeration and pure-oxygen capacity for the new peak biomass
- Electrical upgrade: transformer, distribution, standby generation
- Pumping and water-treatment capacity
- Feed storage, transport and automatic feeding capacity
- Nursery or hatchery capacity for the juvenile calendar
- Harvest, ice and chilling capacity
- Monitoring, alarms and control to protect the larger biomass
What the RFQ must contain
- Current and contracted production in tonnes per year, plus the peak month
- Species, production system and cycle structure
- Peak standing biomass the equipment must support
- Water source, temperature range, salinity and exchange constraints
- Existing installed aeration, pumping and electrical capacity
- Site power limit and whether standby generation is included
- Required commissioning date and any contractual penalty dates
- Scope split: supply only, supply and installation, or commissioning included
Tools for this decision
Questions buyers ask at this moment
Turn the situation into a scoped project
Start from what changed commercially, not from an equipment list. We help define the scope, prepare a comparable RFQ and source international manufacturers. Buyers never pay for sourcing.