Southeast Asia · Shrimp Vertical
Shrimp Farming Equipment & Suppliers in Indonesia
FishMatch is the private sourcing concierge for shrimp producers in Indonesia. We match buyers in Lampung, East Java, Sulawesi, Aceh with verified global suppliers of L. vannamei hatchery systems, RAS, aerators, biofloc kits, feed and processing — under full confidentiality.
Why Indonesia
Indonesia is one of the global shrimp powerhouses, with production concentrated in Lampung, East Java, Sulawesi, Aceh and exports flowing through Jakarta, Surabaya. Buyers face fragmented supplier markets, opaque pricing and language barriers — FishMatch removes all three.
What we source
Complete grow-out and hatchery turn-key projects, RAS and biofloc retrofits, aeration, water treatment, automatic feeders, oxygen generators, plus broodstock and post-larvae partners. We do not publish supplier names; matches are private to each request.
Financing layer
With your consent, a shrimp project can be referred to independent financing providers for equipment leasing, buyer credit, trade finance or working capital. Each provider sets its own terms and decides case by case. We are not a lender.
Get Free Private Quotes
Talk to a shrimp specialist
Financing Disclaimer: FishMatch Group supports procurement project preparation, not credit decisions. Optional introductions require separate explicit consent before sharing. Availability is subject to provider confirmation and local law. This is not pre-approval, an offer, underwriting or a recommendation. Referral, packaging and compensation arrangements require local legal review. See Terms.
Size your harvest vacuum before you request quotes
Shrimp Harvest Vacuum & Pump Sizing
Shrimp harvest vacuum (fish pump) systems are specified by live product throughput, the water carried with the product, hose diameter, lift height and the vacuum level the pump must hold without damaging the animals. Size the duty here, then request comparable quotes on the same spec.
Shorter windows raise pump size and cooling/ice demand.
2–4 typical for vannamei; gentler handling needs more water.
1.5–2.0 m/s keeps shrimp intact; above 2.5 m/s raises damage.
Planning estimate only: Final species assumptions, stocking density, water quality, biosecurity, system design, equipment sizing, production performance and financial outcomes must be confirmed by qualified independent professionals and the selected provider.
Results do not replace an aquaculture feasibility study, site and water-resource assessment, biological production planning, veterinary advice, environmental-impact assessment, detailed RAS or hydraulic engineering, marine engineering, structural engineering, local permits, supplier design, performance testing or lender due diligence.
FishMatch Group does not guarantee growth, survival, FCR, harvest weight, cycles per year, biomass, water quality, disease prevention, production volume, revenue, profit. Outputs are not legal, financial, engineering, tax or veterinary advice. Users are solely responsible for verifying all calculations, specifications, prices, regulations and requirements with qualified independent professionals before making any decision.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
FAQ
Approvals and authorities to contact in Indonesia: shrimp farm request page →
Import & export documentation checklist for Indonesia
Work through this list before you place an equipment order or ship finished product through Jakarta, Surabaya. Missing paperwork is the most common cause of demurrage, delayed commissioning and rejected consignments.
Importing equipment into Indonesia
- Commercial invoice and packing list matching the purchase order line by line
- Bill of lading or air waybill with correct consignee and notify party
- Certificate of origin and confirmed HS classification for each machine
- Import permit or licence where the product category requires one
- CE or equivalent conformity declaration, plus electrical rating matched to local voltage/frequency
- Operating manuals, wiring diagrams and recommended spare-part list
- Insurance certificate and agreed Incoterm (FOB / CIF / DAP)
- Veterinary or sanitary certificate for live animals, feed and biologicals
Exporting shrimp product from Indonesia
- Health / sanitary certificate from the competent authority
- Farm or establishment registration and approval number
- HACCP plan and traceability records per production lot
- Certificate of origin and any preferential-trade documentation
- Residue and antibiotic test reports for EU / US / Japan buyers
- Cold-chain temperature logs from harvest to container loading
- Container stuffing report, seal numbers and phytosanitary annexes where required
Indicative list for planning only — always confirm current requirements with your customs broker and the competent authority in Indonesia.
Plan, size and source for Indonesia
FishMatch Group is a private sourcing concierge, not a lender, bank or financial institution. Supplier identities are kept confidential. Financing is subject to third-party approval.
Other languages
Short answer
What is the fastest way to get quotes for Indonesia?
Submit one structured request for Indonesia. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer