RAS sourcing · supplier directory
Aquaculture supplier directory with a species, capacity and system matching engine
Enter your species, target tonnes per year, system type and delivery region. The matching engine ranks reviewed manufacturer capability profiles and shows you the equipment specifications, certifications and lead times behind each fit score — with supplier identities kept confidential until FishMatch reviews your brief.
Supplier and manufacturer listings are provided for research, transparency and discovery only. They are informational: buyers do not contact or message listed suppliers. Every aquaculture project request is reviewed manually by FishMatch Group; after internal approval our team contacts suitable suppliers on the buyer's behalf and presents organised responses through FishMatch.
Supplier matching engine
Fit scores weight species coverage 35%, system scope 30%, capacity band 25% and delivery region 10%. Each result lists both the reasons behind the score and the gaps, so you can see where a profile is a stretch.
Match by species, capacity and system
Scores are a planning aid from self-declared capability data. Supplier identities stay confidential — FishMatch reviews your brief and makes introductions after that review.
- FM-FSH-340750–4,000 t/y
Feeding, grading and biomass handling equipment
Salmon / post-smolt · Trout · Tilapia · Seabass / seabream · Other finfish
RAS / recirculating · Flow-through / partial reuse · Cage / offshore · Pond — Europe, Americas, Asia-Pacific, Middle East & Africa
100%
Fit score
- Builds for salmon / post-smolt
- RAS / recirculating scope
- 600 t/y sits inside their 50–4,000 t/y band
- Delivers into Europe
- FM-RAS-4782300–3,000 t/y
Turn-key RAS integrator for cold-water post-smolt and grow-out
Salmon / post-smolt · Trout
RAS / recirculating · Hatchery & nursery — Europe, Americas
100%
Fit score
- Builds for salmon / post-smolt
- RAS / recirculating scope
- 600 t/y sits inside their 300–3,000 t/y band
- Delivers into Europe
- FM-WAT-662120–5,000 t/y
Water treatment and oxygenation specialist (component supplier)
Salmon / post-smolt · Trout · Tilapia · Seabass / seabream · Shrimp · Other finfish
RAS / recirculating · Flow-through / partial reuse · Hatchery & nursery — Europe, Americas, Asia-Pacific
100%
Fit score
- Builds for salmon / post-smolt
- RAS / recirculating scope
- 600 t/y sits inside their 20–5,000 t/y band
- Delivers into Europe
- FM-HAT-772510–500 t/y
Hatchery and nursery systems for finfish and shrimp
Salmon / post-smolt · Trout · Tilapia · Seabass / seabream · Shrimp
Hatchery & nursery · RAS / recirculating — Europe, Asia-Pacific, Americas
87%
Fit score
- Builds for salmon / post-smolt
- RAS / recirculating scope
- Adjacent to their usual capacity band
- Delivers into Europe
- FM-RAS-8093800–10,000 t/y
Large-scale RAS EPC contractor for 1,000 t/y and above
Salmon / post-smolt · Seabass / seabream · Trout · Other finfish
RAS / recirculating — Europe, Americas, Middle East & Africa
87%
Fit score
- Builds for salmon / post-smolt
- RAS / recirculating scope
- Adjacent to their usual capacity band
- Delivers into Europe
- FM-CAG-1188200–6,000 t/y
Marine cage systems, moorings and net technology
Salmon / post-smolt · Seabass / seabream · Other finfish
Cage / offshore — Europe, Middle East & Africa, Asia-Pacific
70%
Fit score
- Builds for salmon / post-smolt
- 600 t/y sits inside their 200–6,000 t/y band
- Delivers into Europe
- RAS / recirculating outside declared scope
- FM-RAS-5310100–1,200 t/y
Modular RAS packages for warm-water tilapia and seabass
Tilapia · Seabass / seabream · Other finfish
RAS / recirculating · Flow-through / partial reuse — Europe, Middle East & Africa, Asia-Pacific
65%
Fit score
- RAS / recirculating scope
- 600 t/y sits inside their 100–1,200 t/y band
- Delivers into Europe
- No declared salmon / post-smolt reference
- FM-SHR-291450–800 t/y
Indoor shrimp systems: biofloc and clear-water RAS
Shrimp
RAS / recirculating · Biofloc · Pond · Hatchery & nursery — Asia-Pacific, Americas
55%
Fit score
- RAS / recirculating scope
- 600 t/y sits inside their 50–800 t/y band
- No declared salmon / post-smolt reference
- No declared delivery record in Europe
Reference codes are stable identifiers. Names, websites and contact details are never published; FishMatch introduces shortlisted manufacturers only after a human review of your brief.
Supplier directory FAQs
- How does the supplier matching engine work?
- You enter species, target annual capacity, system type and delivery region. Each reviewed capability profile is scored against those four inputs — species coverage 35%, system scope 30%, capacity band 25% and regional delivery 10% — and returned with the reasons and the gaps behind the score.
- Why are supplier names, websites and contacts not shown?
- FishMatch runs managed sourcing, not an open marketplace. Buyers compare anonymised capability profiles by reference code. FishMatch reviews your brief and introduces suitable manufacturers afterwards, so there is never automatic buyer-to-supplier contact.
- Is a high match score a recommendation?
- No. The score is a planning aid based on self-declared capability data checked for consistency. It is not a ranking, endorsement or technical due-diligence result.
- Can the right supplier be outside this list?
- Yes, often. The published set is a sample of reviewed capability profiles. When FishMatch reviews an RFQ, manufacturers outside the published set are approached as well.
- How do I find RAS suppliers for a commercial fish farm?
- Start with your project inputs — species, annual tonnes, water source and site — not with a supplier list. FishMatch turns those inputs into a technical RFQ and runs managed, confidential outreach to RAS manufacturers whose declared capability matches your scope. You compare anonymised profiles first; introductions follow only after your brief is reviewed.
- What does a RAS supplier project usually include?
- A complete RAS scope covers tanks, mechanical filtration, biofiltration, degassing, oxygenation, disinfection, pumps, controls and monitoring, plus installation, commissioning, training and spare parts. Building and civil works, power connection, water permits and effluent treatment are commonly excluded — always check the included/excluded list before comparing prices.
- What do I need before requesting a shortlist?
- Species, target tonnes per year, harvest size, water source and temperature, site location and permit status. Without these, quotations are built on different assumptions and cannot be compared.
Size the project before you shortlist
A shortlist is only useful when your own sizing and cost basis are fixed. Run these first, then match.
RAS planning calculators
Turn the concepts in this guide into numbers: size the system, check the water budget, test feasibility and compare bids before you brief suppliers.
- RAS system sizing calculator
Size tanks, flow rate, biofilter volume and oxygen supply from your target biomass and feed load.
Open calculator - RAS water turnover & exchange rate calculator
Check hydraulic retention time and daily new-water exchange against stocking density and feed input.
Open calculator - RAS feasibility & production cost calculator
Estimate cost per kilogram produced — feed, energy, oxygen, labour — before committing CAPEX.
Open calculator - RAS bid normalizer — compare supplier quotations
Compare RAS supplier quotes on identical scope so price, capacity and lead time line up line-for-line.
Open calculator
Short answer
What is the fastest way to get quotes for RAS Supplier Directory?
Submit one structured request for RAS Supplier Directory. FishMatch Group translates it into a technical RFQ, runs a confidential sourcing round with project-matched international suppliers, and returns comparable quotations. No fee is charged to the buyer, and your identity and project details stay private until you choose to proceed.
- How it works:
- One structured request, human-reviewed before any supplier outreach
- Typical turnaround:
- Depends on scope and site data; no turnaround is guaranteed
- Confidentiality:
- Supplier names are never exposed during evaluation
- Cost to buyers:
- No fee charged to the buyer
Before you request quotes
Equipment scope
What equipment does a commercial aquaculture project actually need?
A grow-out project typically needs holding infrastructure (tanks, ponds or cages), water movement (pumps, piping, valves), aeration or oxygenation, water treatment appropriate to the system, feeding equipment, grading and handling gear, monitoring and alarms, and backup power. RAS adds mechanical filtration, biofiltration, degassing, disinfection and tighter process control. Hatchery and processing scopes are specified separately.
Which equipment should be specified before requesting quotes?
Specify the items whose sizing changes everything downstream: design biomass and stocking density, water exchange or recirculation rate, oxygen demand at peak temperature, and installed pumping head. With those four fixed, suppliers can quote aeration, filtration, pumps and power on the same basis. FishMatch calculators produce these figures and attach them to the RFQ.
Can equipment be sourced in stages?
Yes, and phased procurement is common. The usual sequence is water supply and holding infrastructure, then aeration and treatment, then automation and monitoring, then processing and cold chain. Staging works when interfaces and capacity headroom are defined at the start; otherwise later phases force replacement rather than addition.
Supplier selection criteria
How should a buyer compare aquaculture suppliers?
Compare on evidence, not on presentation: delivered projects at a similar scale and climate, engineering support during design, lead time commitments, spare-part and service availability in your region, certification and testing documentation, payment and warranty terms, and willingness to quote against your specification rather than substituting a catalogue package.
What are the warning signs in a supplier quotation?
Treat these as review triggers: no itemised scope, guaranteed biological or financial performance, no named delivery terms or lead time, no spare-parts or service statement, unclear responsibility for installation and commissioning, and equipment sizing that does not reference your water temperature, oxygen demand or biomass targets.
How does FishMatch handle supplier selection?
FishMatch is an independent sourcing service, not a manufacturer or reseller. The buyer submits one structured project request; our team reviews it first and only then contacts suitable suppliers on the buyer's behalf, presenting their responses through FishMatch in a comparable format. Buyers do not contact suppliers directly and nothing is sent automatically. The final choice stays with the buyer.